Statement of Work - Attachment 16 - 01 45 00 - Quality Control

Updated

A Word document (50 KB) attached to JB Charleston Multiple Award Construction Contract, from the Department of the Air Force. Due Nov 2, 2026, 12:00 PM (UTC-5).

File name: Statement of Work - Attachment 16 - 01 45 00 - Quality Control.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

***************************************************************************

USACE / NAVFAC / AFCEC / NASA

UFGS-01 45 00.00 10 (November 2016)

Change 1 - 02/20

------------------------------------ Preparing Activity: USACE
SupersedingUFGS-01 45 00.00 10 (February 2010)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated July 2021
***************************************************************************

SECTION 01 45 00

QUALITY CONTROL

JB Charleston (Dec 2021)

*************************************************************************** NOTE: This guide specification covers requirements for Contractor Quality Control for construction projects or design-build construction projects. This section can be used for both design-build and design-bid-build projects.

Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable item(s) or insert appropriate information.

Remove information and requirements not required in respective project, whether or not brackets are present.

Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR). ***************************************************************************

PART 1 GENERAL

1.1 REFERENCES

*************************************************************************** NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.

Use the Reference Wizard's Check Reference feature when you add a Reference Identifier (RID) outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates.

References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process. ***************************************************************************

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

The beginning of the document. Download the full file to read on.