UFGS-01 45 00.00 10 (November 2016)
Change 1 - 02/20
------------------------------------ Preparing Activity: USACE
SupersedingUFGS-01 45 00.00 10 (February 2010)
UNIFIED FACILITIES GUIDE SPECIFICATIONS
References are in agreement with UMRL dated July 2021
***************************************************************************
SECTION 01 45 00
QUALITY CONTROL
JB Charleston (Dec 2021)
*************************************************************************** NOTE: This guide specification covers requirements for Contractor Quality Control for construction projects or design-build construction projects. This section can be used for both design-build and design-bid-build projects.
Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable item(s) or insert appropriate information.
Remove information and requirements not required in respective project, whether or not brackets are present.
Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR). ***************************************************************************
PART 1 GENERAL
1.1 REFERENCES
*************************************************************************** NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.
Use the Reference Wizard's Check Reference feature when you add a Reference Identifier (RID) outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates.
References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process. ***************************************************************************
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation
- Solicitation Attachment XU - Past Performance Customer Questionnaire
- Solicitation Attachment XV - Past Performance Survey
- Solicitation Attachment XW - JB Charleston MACC Work Load Estimate
- Solicitation Attachment XX - Task Order Proposal Request Seed Project
- Solicitation Attachment XY - On and Off-Ramp Procedures
- Statement of Work - JB CHS MACC
- Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A E)
- Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS Request for Information Form
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form (Submittal Register)
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form (Request for Information Register)
- Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures