TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR
MANUFACTURER'S CERTIFICATES OF COMPLIANCE
DATE
TRANSMITTAL NO.
The proponent agency is 628CES/CEN.
SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor) TO:
FROM:
CONTRACT NO.
CHECK ONE:
THIS IS A NEW TRANSMITTAL
THIS IS A RESUBMITTAL OF
TRANSMITTAL
SPECIFICATION SEC. NO. (Cover only one section with each transmittal)
THIS TRANSMITTAL IS FOR: (See Note 8)
PROJECT TITLE AND LOCATION
FIO
ITEM
NO.
(See
Note 3)
DESCRIPTION OF SUBMITTAL ITEM
(Model Number, Catalog Number, Manufacturer, Nomenclature of Material, etc.)
a.
b.
REMARKS
SUBMITTAL
TYPE CODE
(See Note 9)
c.
GA
CONTRACT DOCUMENT
REFERENCE
TYPE
OF
COPIES
(See Note 1)
d.
SPEC.
PARA. NO.
DRAWING
SHEET NO.
e.
f.
DA
CR
DA/CR
DA/GA
VARIATION
(See Note 6)
TIME/COST
IMPACT
(See Note 7)
GOV
ACTION
CODE
(Note 10)
g.
h.
i.
I certify that the above submitted items had been reviewed in detail and are correct and in strict conformance with the contract drawings and specifications except as otherwise stated.
NAME OF QC MANAGER
SIGNATURE OF QC MANAGER
SECTION II - APPROVAL ACTION
NAME AND TITLE OF APPROVING AUTHORITY
REMARKS
SIGNATURE OF APPROVING AUTHORITY
JB CHS TRANSMITTAL FORM 4025, 20210421
REPLACES AF IMT 3000, WHICH IS OBSOLETE.
DATE
NOTES
1. Indicate "E" For Electronically Submitted or "H-#” for hard copy (replacing “#” with the quantity) 2. Each Transmittal shall be numbered consecutively. If the Transmittal is a resubmittal, then add a decimal point to the end of the original Transmittal Number and begin numbering the resubmittal packages sequentially after the decimal. 3. The "Item No." for each entry on this form will be the same "Item No." as indicated on the submittal register. 4. Submittals requiring expeditious handling will be submitted on a separate Transmittal Form. 5. Items transmitted on each transmittal form will be from the same specification section. Do not combine submittal information from different specification sections in a single transmittal.
6. If the data submitted are intentionally in variance with the contract requirements, indicate a variation in column g, and enter a statement in the Remarks block describing he detailed reason for the variation.
7. If the variation causes an impact to time or cost indicate the type of impact in column h, and enter the associated RFI number in the remarks 8. Select one of the following depending on which approval source is required. FIO – For Information Only
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation
- Solicitation Attachment XU - Past Performance Customer Questionnaire
- Solicitation Attachment XV - Past Performance Survey
- Solicitation Attachment XW - JB Charleston MACC Work Load Estimate
- Solicitation Attachment XX - Task Order Proposal Request Seed Project
- Solicitation Attachment XY - On and Off-Ramp Procedures
- Statement of Work - JB CHS MACC
- Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A E)
- Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS Request for Information Form
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form (Submittal Register)
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form (Request for Information Register)
- Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures