STATEMENT OF WORK (SOW)

Project Title: HVAC Split System Installation and Interior Restoration Facility / Location: Seymour Johnson Air Force Base, 1600 Wrights Brothers Ave., Goldsboro, NC 27531 (Room 2821)

Scope of Work Purpose
The Contractor shall provide all personnel, management, supervision, tools, materials, equipment, transportation, and incidentals necessary to remove, furnish, and install a complete split heat pump system and perform associated interior architectural restoration in Room 2821 at Seymour Johnson Air Force Base.

Purpose
The overall objective of this project is to deliver reliable, efficient climate control to Room 2821 and restore adjacent interior wall surfaces affected during equipment and line set routing.

Detailed Work Breakdown & Technical Requirements
The Contractor shall lawfully remove and dispose of the existing HVAC unit.

2. HVAC Equipment & Installation The Contractor shall furnish and install: a. Heat Pump Split System: Approved Make/Model or Equal: American Standard (or approved technical equivalent) Capacity: 2-Ton (24,000 BTU) Efficiency Rating: Minimum 14 SEER Auxiliary Heat: 10 kW Electric Heat Strip b. Refrigerant Line Set: Supply and install a new, properly sized and insulated copper refrigerant line set connecting the outdoor condensing unit and indoor air handling unit. c. Controls: Furnish and install one (1) new commercial digital/programmable thermostat. Configure setpoints and verify communication between the thermostat and air handler. d. Testing, Balancing, and Commissioning: Evacuate, vacuum test, charge, and leak-check the refrigerant lines in accordance with manufacturer specifications. Perform full operational testing of cooling, heating, auxiliary heat (10 kW), defrost cycles, and blower performance.

Interior Repair and Finishing (Sheetrock & Paint)
Following the mechanical installation and lineset routing: 1. Sheetrock Installation / Patching: Repair and install new gypsum wallboard/sheetrock across all wall and ceiling openings created for equipment, ductwork, or refrigerant line penetrations. Tape, mud, and sand all joints and fastener penetrations to achieve a smooth, defect-free, paint-ready surface. 2. Painting & Finishing: Prime all patched and repaired surfaces. Apply finish coat(s) of paint matching the existing surrounding interior wall color and sheen of Room 2821.

Period of Performance & Schedule
1. Working Hours: All work shall be performed during standard base operational hours (typically Monday through Friday, 0730 to 1630 hours), excluding federal holidays, unless prior written authorization is granted by the contracting officer.