Tab 15 - Appendix I - General Requirements
Updated
A PDF document (713 KB) attached to Request for Lease Proposal (RFLP) Enhanced Use Leasing Project Davis-Monthan Air Force Base, AZ, from the Department of the Air Force. Due Nov 2, 2026, 5:00 PM (UTC-6).
File name: Tab 15 - Appendix I - General Requirements.pdf
The full file is for paid members, or buy this bid alone.
Preview
United States Department of the Air Force
Air Force Civil Engineer Center
(AFCEC)
Enhanced Use Leasing Project
Davis-Monthan Air Force Base
Request for Lease Proposal (RFLP)
Appendix I
General Requirements
RFLP No. AFCEC-26-R-0003
Request for Lease Proposal No. AFCEC-26-R-0003
Davis-Monthan Air Force Base EUL
Appendix I
APPENDIX I
GENERAL REQUIREMENTS
The Department of the Air Force (DAF) requires that the Lessee address the current Combat Arms Training and Maintenance (CATM) facility and associated Surface Danger Zone (SDZ) mitigation strategies; comply with the Land Use Control Implementation Plan for Munitions Response Sites TM553, TM553A, and TM554A, DMAFB, Tucson Az. The Property is not developable unless the CATM facility is relocated, as the current CATM facility sits within the current SDZ and must be relocated to facilitate the proposed EUL site. Proposals must clearly outline how they will address this requirement.
In order to develop the Leased Premise, the Lessee must, construct a new CATM facility in accordance with Appendices A-3 through A-3c on a currently undeveloped site to be located on the Installation but outside of the Property in the general area of the existing CATM facility (exact location to be determined during negotiations) at Lessee's sole cost and expense. For planning purposes only, a conceptual design of the new CATM including ranges and administrative facility is attached as Appendix A-3c.
This new CATM facility must include two (2) 50 meter by 50 meter small arms ranges supporting 5.56mm and 9mm zeroing, training, and qualification activities for both day and night. Ranges must be illuminated to 30 meters for night shooting. These ranges must be designed to contain the SDZ by providing berms on both sides and the downrange end and must incorporate a structure capable of preventing fired rounds from exiting the range (see conceptual plan) without being fully baffled. The design shall also incorporate materials that will not cause bullets to ricochet. These 50-meter ranges must each contain 28 covered firing points, an elevated tower for instructor observation and control, and adequate storage for essential range equipment.
Additionally, the new CATM facility must include one (1) range capable of accepting up to 7.62mm training and qualifications to 800 meters and a width of 50 meters. The 800-meter range must have berms on both sides and the downrange end. The firing points must have an overhead structure capable of preventing fired rounds from exiting the range (see conceptual
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Tab 1 - DMAFB EUL RFLP
- Tab 10 - Appendix D - Non-Disclosure Provisons
- Tab 11- Appendix E - Mandatory Clause
- Tab 12 Appendix F Offerors Cover Page
- Tab 13 - Appendix G - Pre-Offer Inquiry Form
- Tab 14 - Appendix H - Environmental Baseline Survey
- Tab 2 - Appendix A-1 - Depiction of Property and Map
- Tab 3 - Appendix A-2 - Existing Improvements
- Tab 4 - Appendix A-3 - CATM Effort General Requirments
- Tab 6 - Appendix A-3b - CATM RANGE BAFFLES CONCEPT
- Tab 7 - Appendix A-3c - CATM RANGE - DEVELOPMENT CONCEPT
- Tab 8 - Appendix B - Existing Encumbrances Third Party Property Interests