HAPGOOD POND RECREATION AREA

WATER TANK CLEANING AND INSPECTION

TECHNICAL SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

01100 - SUMMARY OF WORK

01200 - MEASUREMENT & PAYMENT

01350 – PROJECT MANAGEMENT AND COORDINATION

DIVISION 22 – PLUMBING

22120 – WATER STORAGE TANK CLEANING AND INSPECTION

END OF INDEX

SECTION 01100

SUMMARY OF WORK

PART 1 - GENERAL

1.01

PROJECT IDENTIFICATION

Project Name and Location: Hapgood Pond Recreation Area Water Tank Cleaning and Inspection. Located on Hapgood Pond Road, Town of Peru, Bennington County, VT. 1.02
A.

SUMMARY OF WORK

Project Summary Description: The project includes, but is not limited to, the following major items of Work:
1. Water storage tank – Remove all sediment and pressure wash inside and out, inspect, and sanitize tank. Water tank interior dimensions are approximately 15’-4” diameter and 8’-9” deep.

1.03

SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY

A. Government furnished property to be installed by the Contractor:

1. None

1.04

MISCELLANEOUS PROVISIONS

A. The Contractor shall comply with the requirements of all permits obtained by the Government. The Contractor is responsible to pay for all inspection fees related to permits or requirements of other governing agencies, utilities, etc.

END OF SECTION

SECTION 01200

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.01

SUMMARY

A. This Section includes:

1. Measurement and payment criteria applicable to the work performed under a Lump Sum payment method.
2. Defect assessment and non-payment for rejected work.

1.02

AUTHORITY

A. The Contracting Officer’s Representative (COR) will take all measurements and compute quantities accordingly.

1.03

MEASUREMENT OF QUANTITIES

A. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the Contract, including all necessary materials, equipment, and labor to complete the job. They will not be measured.

1.04

PAYMENT

A. Payment Includes: Full compensation for all required labor, products, tools, equipment, plant, transportation, services, and incidentals; erection, application, or installation of an item of the Work; overhead and profit.
1. "Incidentals" are to be considered as an additional obligation to the other work required for the item(s). Incidental work is not payable directly, but is to be considered included in the contract price for the item(s) of work specified. 2. All work not specifically identified as a separate bid item in Subsection 1.05 below is "Incidental".
B. The accepted quantities will be paid for at the contract unit price for each item as shown in