Home / Fire Alarm Control Panel Replacement Project (FACPR) / Document

A Statement of Work for Subcontract

Updated

A PDF document (775 KB) attached to Fire Alarm Control Panel Replacement Project (FACPR), from the Department of Energy. Due Jan 8, 2027, 5:00 PM (UTC-8).

File name: A_Statement of Work for Subcontract 7889840 (10.12.26).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

​

STATEMENT OF WORK

Project Name

Fire Control Panel Replacement

Project Number

109856

Acquisition Type

Design Build

Date

10/12/2026

Prepared by:

Reviewed by:

Carlos Guerrero, Project Manager

Jenny Ledesma, Project Director

Projects and Infrastructure Modernization Division

Projects and Infrastructure Modernization Division

Statement of Work (SOW) for Design Build

PIMD-TEMP-040​

Rev.7: 02/06/2026​

Doc ID: 35cdc1bcca665aa9c150e81c9c5cb37aa99391ed

​

REVISION HISTORY*

(Revision history for this document did not start being documented until revision no. 6) Rev No.

Rev Date

Sections

Brief Descriptions of Revisions
Sec 2.2: Weekend/Holiday Notifications

09/23/2025

Sec. 2.2, 4.4,
4.10, 4.12

Sec 4.4: Testing and Inspection turnaround
requirements
Sec 4.10: Off-site Soil Disposition
Sec 4.12: Safety Submittals review
turnaround requirements
Sec 3.2: Performance Requirements

02/06/2026

Sec. 3.2, 3.4.3,
3.4.7, 4.10

Sec. 3.4.3: Minimum Required Div 1 Specs
and Minimum Technical Specs
Sec 3.4.7: Design Schedule
Sec 4.10: Off-site Soil Disposition

Statement of Work (SOW) for Design Build

PIMD-TEMP-040​

Rev.7: 02/06/2026​

Doc ID: 35cdc1bcca665aa9c150e81c9c5cb37aa99391ed

​

1.0​

Project Scope​

1.1.​

Background​

1.2.​

Project Objectives​

1.3.​

Project Description​

1.4.​

Applicable Codes and Standards​

1.5.​

Alternates and Options​

General Requirements​

2.0​
2.1.​

Definitions​

2.2.​

Coordination of Work​

2.3.​

Final Acceptance​

3.0​

Design​

3.1.​

Existing Site Conditions​

3.2.​

Design Requirements​

3.3.​

Review Meetings​

3.4.​

Design Deliverables​

3.5.​

Construction Support​

3.6.​

Commissioning​

4.0​

Construction​

4.1.​

Staging/ Parking/ Traffic Control​

4.2.​

Utility Deactivation​

4.3.​

Government Furnished Equipment (GFE)​

4.4.​

Services provided by LBNL​

4.5.​

U.S. Government and/or University Property-Materials to be Removed​

4.6.​

Environmental Protection​

4.7.​

Hazardous Materials and Restricted Items​

4.8.​

Construction Noise and Vibration Control​

4.9.​

Building Characterization​

4.10.​ Off-site Soil Disposition Quantities and Requirements​

4.11.​ Waste Management​

4.12.​ Safety​

5.0​

Reference Documents​

Statement of Work (SOW) for Design Build

PIMD-TEMP-040​

Rev.7: 02/06/2026​

Doc ID: 35cdc1bcca665aa9c150e81c9c5cb37aa99391ed

​

5.1.​

Construction Details and Design Requirements (Version 0 – 9.30.24)​

5.2.​

Applicable Technical Specifications​

5.3.​

Design Deliverables Matrix (Version 2.0 – 06.30.26)​

5.4.​

Fire Alarm Control Panel Replacement Conceptual Design Report​

5.5.​

Fire Alarm As-Builts for Buildings 2, 26, 33, and 76​

Statement of Work (SOW) for Design Build

The beginning of the document. Download the full file to read on.

Other documents in this bid