University of California
Lawrence Berkeley National Laboratory

GENERAL PROVISIONS FOR FIXED PRICE DESIGN-BUILD

INDEX

1. DEFINITIONS

2. SCOPE OF SUBCONTRACT

3. PAYMENT BOND

4. PERFORMANCE BOND

5. SURETIES AND ADDITIONAL PROTECTION

6. WALSH-HEALEY PUBLIC CONTRACTS ACT

7. EXPORT CONTROL AND NOTIFICATION

8. ASSIGNMENTS

9. DISPUTES AND CLAIMS

10. NON-WAIVER OF DEFAULT

11. ENVIRONMENT, SAFETY, AND HEALTH

12. WORKER SAFETY AND HEALTH

13. ACCIDENT PREVENTION PROGRAM REQUIREMENTS

14. INJURY REPORTING

15. LIENS AND CLAIMS FOR LABOR OR MATERIALS

CLAUSE 1 – DEFINITIONS

As used herein, the following terms shall have the indicated meanings: ●
●
●
●
●
●
●
●
●
●
●

"CFR" means the U.S. Code of Federal Regulations.
"DEAR" means the DOE Acquisition Regulation.
"DOE" means the U.S. Department of Energy.
"FAR" means the Federal Acquisition Regulation.
"Government" means the United States Government.
"LBNL" means the Lawrence Berkeley National Laboratory. "Patent Counsel" means the DOE Patent Counsel.
"Subcontract" means the subcontract between the University and the Subcontractor which includes these General Provisions. "Subcontractor" means the party who has entered into this Subcontract with the University, as identified in the Subcontract. The lower-case term "subcontractor" means the Subcontractor's subcontractor(s).
"University" means The Regents of the University of California, acting through the LBNL.

CLAUSE 2 – SCOPE OF SUBCONTRACT

The scope of the Subcontract shall be limited to the acquisition of fixed price architect-engineer services and fixed price construction. The Subcontract is entered into under the University's Prime Contract No. DE-AC02-05CH11231 with DOE for management and operation of LBNL. The University is committed to doing business in a socially responsible, sustainable, and ethical manner, consistent with the University’s mission, values, and principles. As such, the University expects Subcontractors performing work for the University under this Subcontract to provide goods and services in a manner consistent with the University’s Stewardship Values including trust and respect.

CLAUSE 3 – PAYMENT BOND

For subcontracts over $150,000, before a Notice to Proceed is issued or before the Subcontractor is allowed to start work, the Subcontractor shall furnish to the University on the Laboratory's forms and naming the