C FACPR Request for Proposals Attachment C - Price Proposal
Updated
A PDF document (230 KB) attached to Fire Alarm Control Panel Replacement Project (FACPR), from the Department of Energy. Due Jan 8, 2027, 5:00 PM (UTC-8).
File name: C_FACPR_RFP_Attachment C - Price Proposal (11.12.26).pdf
The full file is for paid members, or buy this bid alone.
Preview
University of California
Lawrence Berkeley National Laboratory
Request for Proposal: 2026-PTG-FACPR
ATTACHMENT C - PRICE PROPOSAL FORM
Request for Proposal: 2026-PTG-FACPR
Project: Fire Alarm Control Panel Replacement Project
Offeror Name:
Address:
Point of Contact:
Telephone:
Email Address:
Unique Entity
Identifier (SAM.gov):
INSTRUCTIONS
1. Complete every blank cell. Enter "$0" rather than leaving a cell blank if no cost applies. 2. The Total Lump Sum Price in Table A is the evaluated price. 3. The total in Table B must equal the total in Table A. 4. Do not include exclusions, qualifications, or conditions in this form. An offer that conditions its price may be found non-responsive. Technical assumptions belong in the Technical Volume (Attachment B, Factor 3, item 7).
5. Do not include any pricing information in the Technical Volume.
OFFEROR REPRESENTATIONS
Offer. The Offeror submits this offer for a firm-fixed-price design-build subcontract for the work described in the RFP, including Attachment A – Statement of Work and all addenda. Site conditions. The Offeror attended the mandatory pre-proposal conference and on-site inspection, has examined Buildings 2, 26, 33, and 76, and understands that LBNL-provided records may not reflect current field conditions.
Offer validity. This offer remains valid and will not be withdrawn for 180 calendar days after the proposal due date.
Addenda. The Offeror acknowledges receipt of the following addenda and has included their effect in the prices below. Failure to acknowledge all addenda may render the offer non-responsive. Addendum No.
Date
University of California
Lawrence Berkeley National Laboratory
Request for Proposal: 2026-PTG-FACPR
Contractor licenses. The Offeror holds the following active California Contractors State License Board license(s):
Classification
License No.
Expiration Date
Bonds. The Offeror will furnish performance and payment bonds, each at 100% of the subcontract price, from a surety listed in U.S. Treasury Department Circular 570, within ten working days after award and before Notice to Proceed or the start of on-site work. The cost of the bonds is included in the prices below.
TABLE A: SCHEDULE OF PRICES
Construction
Price
Line
Description
Building 2
$
$
$
$
Building 26
$
$
$
$
Building 33
$
$
$
$
Building 76
$
$
$
$
$
$
$
$
Total Fixed Price Lump Sum
(Lines 1-4)
Design Price
Siemens Price
Line Subtotal
Distribute general conditions, mobilization, bonds, insurance, overhead, and profit across Lines 1 through 4. Do
The beginning of the document. Download the full file to read on.