Home / Fire Alarm Control Panel Replacement Project (FACPR) / Document

B FACPR Request for Proposals Attachment B - Factor Resoponse

Updated

A PDF document (277 KB) attached to Fire Alarm Control Panel Replacement Project (FACPR), from the Department of Energy. Due Jan 8, 2027, 5:00 PM (UTC-8).

File name: B_FACPR_RFP_Attachment B - Factor Resoponse (11.12.26).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

University of California
Lawrence Berkeley National Laboratory
Request for Proposal: 2026-PTG-FACPR

ATTACHMENT B – FACTOR RESPONSE REQUIREMENTS

Request for Proposal: 2026-PTG-FACPR
Project: Fire Alarm Control Panel Replacement Project
Instructions: Offerors must provide all information within the Technical Volume submission. Offerors must ensure that each response narrative is clearly identifiable to its associated evaluation factor. Fill in the following pages or provide the answers in the narrative. Information about the Offeror
Offeror Name:
Address:
Point of Contact:
Telephone:
Email Address:
California Contractor's
License No. and
Classification:
Unique Entity
Identifier (SAM.gov):
Responsible Design Professional / Engineer of Record
Firm Name:
In-house or contracted?
Address:
Point of Contact:
Telephone:
Email Address:
California PE License
No. of individual who
will stamp the
drawings:

University of California
Lawrence Berkeley National Laboratory
Request for Proposal: 2026-PTG-FACPR

FACTOR 1 – SAFETY

A "No" answer or a failure to provide the required documentation will likely result in the offeror being excluded from further evaluation.

1. Experience Modification Rate

List the offeror's EMR for each of the three most recent completed premium years, and attach documentation from the offeror's insurance carrier or rating bureau. An EMR higher than 1.00 in any of the three years will result in an Unacceptable rating for this factor.
Year/Rating:

Year/Rating:

Year/Rating:

2. Injury And Illness Record

Provide OSHA Form 300A summaries for the past three calendar years, and the Total Recordable Incident Rate (TRIR) and Days Away, Restricted, or Transferred (DART) rate for each year.

3. OSHA And Cal-OSHA Citations

Has OSHA or Cal-OSHA cited and assessed penalties against the offeror, any of its affiliates, or its proposed lower-tier subcontractors for any "serious," "willful," or "repeat" violations in the past three years? ☐ Yes ☐ No

If "Yes," describe each citation on a separate page, including the case number, the party cited, the date, the category of violation, the project and its owner, any penalty paid, the corrective action taken, and the current status. By submitting a proposal without such a disclosure, the offeror certifies that neither it, its affiliates, nor its proposed lower-tier subcontractors have received a serious, willful, or repeat OSHA or Cal-OSHA

The beginning of the document. Download the full file to read on.

Other documents in this bid