Amendment 1: Amendment Form (SF 30) Pg2
Updated
A Word document (26 KB) attached to Atchison Storm Sewer Separation Improvements, Atchison, Kansas, from the Department of the Army. Due Nov 24, 2026, 1:00 PM (UTC-6).
File name: W912DQ27BA002 Amendment 0001 SF 30_Pg2.docx
The full file is for paid members, or buy this bid alone.
Preview
The SOLICITATION is amended as follows:
NOTE: Deleted text is shown with strikethrough. Added text is shown with underline.
SPECIFICATIONS:
SECTION 01 30 00 Paragraph 1.5.2
1.5.2 Cooperation Between the Contractor and Utility Companies
Relocation of utilities by the utility companies will be necessary concurrently with the work under this contract.
a. Coordination: The Contractor shall coordinate and schedule the work in cooperation with each utility company, to minimize delays and interferences. After receipt of notice to proceed, the Contractor shall notify each utility company and make the necessary arrangements for the utility relocation. The Contractor shall also notify each utility company 30 days in advance of commencing construction work within the vicinity of the utility line.
The City of Atchison Kansas is the service provider for both the Water Utilities and Sewer Utilities. For residential water line, relocation can be excepted to be completed in 1-3 business days. For Water Mains, relocations can be expected to be completed in 5-10 business days.
b. Payment: The Contractor shall pay all costs in connection with the relocations, and shall furnish the Government itemized invoices showing the actual costs billed to and paid by him in full for each utility relocation. The Government will adjust the contract lump sum price for each utility relocation under CONTRACT CLAUSE titled "Changes" from the lump sum amount listed below to the actual amount paid by the Contractor to the respective utility company.
b. Utility Contacts:
Utility Provider
Contact Name
Email
Phone
City of Atchison
Clinton McNemee
[email protected]
(913) 367-5561
AT&T/D
Darrin W. Shepard
[email protected]
(913) 383-4929
Evergy
Willie Kuhn
[email protected]
(816) 556-2200
KGS
Kirk Rodell
[email protected]
(816) 830-2508
Rainbow Telecomm
Nathan McKee
[email protected]
Vyve Broadband
Levi Cox
[email protected]
(785) 278-0549
c. Sanitary and Storm Sewers Conflicts
If conflicts occur between Sanitary and Storm Sewers, the Contractor shall adjust the alignment and/or grade of the storm sewer to maintain the minimum required separation. When minimum vertical separation cannot be maintained, the lower pipe shall be encased in concrete for a minimum of five feet on each side of the crossing, or as directed by the Engineer.
DRAWINGS:
N/A
Offerors are required to acknowledge receipt of this amendment on the Bidding Form in the space provided. Failure to acknowledge all amendments may cause rejection of the proposal.