Geotechnical Report ATCH CSO
Updated
A PDF document (4.9 MB) attached to Atchison Storm Sewer Separation Improvements, Atchison, Kansas, from the Department of the Army. Due Nov 24, 2026, 1:00 PM (UTC-6).
File name: Geotechnical_Report_ATCH_CSO.pdf
The full file is for paid members, or buy this bid alone.
Preview
in
UJ
GEOTECHNICAL EXPLORATION
COMBINED SEWER
OVERFLOW SEPARATION
ATCHISON, KANSAS
Prepared for:
AFFINIS CORP
OVERLAND PARK, KANSAS
Prepared by:
GEOTECHNOLOGY, LLC DBA UES
OVERLAND PARK, KANSAS
Date:
MARCH 6,2025
UES Project No..
J045885.01
SAFETY
TEAMWORK
RESPONSIVENESS
INTEGRITY
VALUE
EXCELLENCE
Environmental
V(O UES
Geotechnical Engineering
Materials Testing
TM
Field Inspections & Code Compliance
Geophysical Technology
March 6, 2025
Mr. Samuel Briscoe, P.E.
Affinis Corp
8900 Indian Creek Parkway, Suite 450
Corporate Woods Building 6
Overland Park, Kansas 66210
Re:
Geotechnical Exploration
Combined Sewer Overflow Separation
Atchison, Kansas
UES Project No. J045885.01
Dear Mr. Briscoe:
Geotechnology, LLC dba UES (UES) presents in this report the results of the geotechnical exploration completed for the referenced project. This report includes our project understanding, observed site conditions, conclusions and/or recommendations, and support data as given in the Table of Contents.
We appreciate the opportunity to provide geotechnical services for this project. If you have questions regarding this report, or if we may be of any additional service to you, please contact the undersigned.
Sincerely,
UES
eNHMcor,
r:
S
NASENSe x
*.:Q.
2AnsPSgs
-0NALCP$4
Q
S
“*/egaeaasct8"
9s
Matt McQuality, P.E.
Office Lead
Masck la, 202S
MHMJAW:mhm
5055 Antioch Road | Overland Park, Kansas 66203 | Phone: (913) 438-1900 | Fax: (913) 438-1923 | teamu
Environmental
VO UES
Geotechnical Engineering
Materials Testing
TM
Field inspections & Code Compliance
Geophysical Technology
Page
1.0 Introduction
3.0 Geotechnical Exploration
5.0 Subsurface Conditions...
6.0 Conclusions and Recommendations
6.1 Features Impacting Excavation ..
7.0 Recommended Additional Services..
8.0 Limitations
FIGURES
Aerial Photograph of Site and Boring Locations
APPENDICES
Boring Log: Terms and Symbols
Summary of Laboratory Results and Laboratory Test Computation Sheets
A
B
C
D
E
F
Environmental
UES
Geotechnical Engineering
Materials Testing
TM
Field Inspections & Code Compliance
Geophysical Technology
GEOTECHNICAL EXPLORATION
COMBINED SEWER OVERLFOW SEPARATION
ATCHISON, KANSAS
MARCH 6, 2025 | UES PROJECT NO. J045885.01
1.0 INTRODUCTION
Geotechnology, LLC dba UES (UES) prepared this geotechnical exploration report for Affinis Corp (Affinis) for the design of storm sewer improvements in Atchison, Kansas. The services documented in this report were provided in general accordance with the scope of services
The beginning of the document. Download the full file to read on.