Bidder Inquire Atchison CSO Construction
Updated
A PDF document (257 KB) attached to Atchison Storm Sewer Separation Improvements, Atchison, Kansas, from the Department of the Army. Due Nov 24, 2026, 1:00 PM (UTC-6).
File name: Bidder Inquire Atchison CSO Construction.pdf
The full file is for paid members, or buy this bid alone.
Preview
11/4/26, 11:09 AM
ProjNet: Logged In User
Classified information is NOT permitted on this site.
Bid Inquiry Contracting Officers Report
All Inquiries
Project: P2 503708 Atchison, KS CSO Environmental Infrastructure Review: Atchison Bidder Inquiry (00001)
(sorted by CommentID )
Displaying 13 inquiries.
Id
Discipline
12037146
Contracting
Sheet
Detail
Spec
00 70 00
Comment Classification: Unclassified (U)
Definitive Responsibility Criteria, requires one contract of $1 million or more demonstrating combined sewer overflow and new sewer construction, performed as a prime contractor or subcontractor. Can the bidder meet this criteria with a contract performed by it's proposed subcontractor or teaming partner?
By: Zachary Oursler; ESI Contracting Corp.; (5156570187).
On: Oct 15 2026.
Forward request by email.
1-0 Evaluation For Information Only.
The Contracting Officer makes the final determination on the DRC. DRC documents can include any partnering, letters of intent, or subcontracting information. By: Joseph Sciarra; PM
Project Management Division; (816 389 3121) On: Oct 19 2026 1-1 Government Response.
The Contracting Officer makes the final determination on the DRC. DRC documents can include any partnering, letters of intent, or subcontracting information. By: Joseph Sciarra; PM Project Management Division; (816 389 3121) On: Nov 04 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
12037165
Civil
31 00 00
Comment Classification: Unclassified (U)
In the earthworks section 1.3.c, it says to base the bid on the material character as indicated by the boring logs. Is the government going to provide the boring logs?
By: Zachary Oursler; ESI Contracting Corp.; (5156570187).
On: Oct 15 2026.
Forward request by email.
1-0 Evaluation For Information Only.
Boring log and a geotechnical report will is attached
(Attachment:
Geotechnical_Report_ATCH_CSO.pdf) By: Joseph Sciarra; PM Project Management Division; (816 389 3121) On: Oct 19 2026
1-1 Government Response.
Boring log and a geotechnical report will is attached in PIEE By: Joseph Sciarra; PM Project Management Division; (816 389 3121) On: Nov 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
12038579
Contracting
00 00 00
Comment Classification: Unclassified (U)
In review of the subject solicitation, as the limits of work are within the confines of the City of Atchison, will the bidders of the
The beginning of the document. Download the full file to read on.