11/4/26, 11:09 AM

ProjNet: Logged In User

Classified information is NOT permitted on this site.
Bid Inquiry Contracting Officers Report
All Inquiries
Project: P2 503708 Atchison, KS CSO Environmental Infrastructure Review: Atchison Bidder Inquiry (00001)
(sorted by CommentID )
Displaying 13 inquiries.
Id

Discipline

12037146

Contracting

Sheet

Detail

Spec

00 70 00

Comment Classification: Unclassified (U)
Definitive Responsibility Criteria, requires one contract of $1 million or more demonstrating combined sewer overflow and new sewer construction, performed as a prime contractor or subcontractor. Can the bidder meet this criteria with a contract performed by it's proposed subcontractor or teaming partner?
By: Zachary Oursler; ESI Contracting Corp.; (5156570187).

On: Oct 15 2026.

Forward request by email.

1-0 Evaluation For Information Only.
The Contracting Officer makes the final determination on the DRC. DRC documents can include any partnering, letters of intent, or subcontracting information. By: Joseph Sciarra; PM
Project Management Division; (816 389 3121) On: Oct 19 2026 1-1 Government Response.
The Contracting Officer makes the final determination on the DRC. DRC documents can include any partnering, letters of intent, or subcontracting information. By: Joseph Sciarra; PM Project Management Division; (816 389 3121) On: Nov 04 2026
Current Request Status: Request Closed
Information for this report is procurement sensitive.
12037165

Civil

31 00 00

Comment Classification: Unclassified (U)
In the earthworks section 1.3.c, it says to base the bid on the material character as indicated by the boring logs. Is the government going to provide the boring logs?
By: Zachary Oursler; ESI Contracting Corp.; (5156570187).

On: Oct 15 2026.

Forward request by email.

1-0 Evaluation For Information Only.
Boring log and a geotechnical report will is attached
(Attachment:
Geotechnical_Report_ATCH_CSO.pdf) By: Joseph Sciarra; PM Project Management Division; (816 389 3121) On: Oct 19 2026
1-1 Government Response.
Boring log and a geotechnical report will is attached in PIEE By: Joseph Sciarra; PM Project Management Division; (816 389 3121) On: Nov 04 2026 Current Request Status: Request Closed
Information for this report is procurement sensitive.
12038579

Contracting

00 00 00

Comment Classification: Unclassified (U)
In review of the subject solicitation, as the limits of work are within the confines of the City of Atchison, will the bidders of the

The beginning of the document. Download the full file to read on.

Other documents in this bid