Home / Atchison Storm Sewer Separation Improvements, Atchison… / Document

KDOT 16th Street Permit

Updated

A PDF document (211 KB) attached to Atchison Storm Sewer Separation Improvements, Atchison, Kansas, from the Department of the Army. Due Nov 24, 2026, 1:00 PM (UTC-6).

File name: KDOT 16th Street Permit.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

121 S.W. 21st Street
Topeka, KS 66612
District 1
Calvin E. Reed, P.E., Secretary

Phone: 785-296-3881
Fax: 785-296-1162
kdot#[email protected]
http://www.ksdot.org
Laura Kelly, Governor

Michael E. Rinehart, P.E., District Engineer

September 16, 2026
City of Atchison
1801 Main Street,
Atchison, KS 66002
Dear Sir/Madam:
Highway Permit 1-2025-1246
Route K-7
ATCHISON County
Attached is your approved copy of the above referenced Highway Permit granting permission to The City of Atchison plans to separate stormwater infrastructure from existing sewer lines in accordance with EPA regulations and the Clean Water Act. An existing storm inlet north of Highway 7 near 16th Street will be rerouted to a new stormwater outlet south of Highway 7. The current designs are 95% complete, and the alignment is not expected to change significantly.. This permit expires 9/16/2027. Once you have downloaded your permit, please notify our Utilities Coordinator, "Kerry Bramhall" using our Kansas Utilities Permit System at least one working day prior to starting any work on the highway so that arrangements can be made for the necessary inspection.
When you commence the work authorized by this permit, it will signify that you agree to any and all changes, additions and/or stipulations made to the original request and attachments. Contractors performing the work will be advised of the requirement to ensure work conforms to this permit. The work performed on the KDOT right of way will be strictly in accordance with this approved permit. Deviation from this permit with attachments (unless approved by KDOT prior to construction) will be cause for non-acceptance of the work and remedial action.
When you have completed all work connected with this permit, please let them know so that the permit can be released.
Yours Truly,
Michael E. Rinehart, P.E.,
District Engineer
Angel Fitzgerald
District Coordinator
Attachment
c: File
Dale Kirmer – via email
Kerry Bramhall – via email
Angel Fitzgerald – via email

Date: 9/16/2026 12:50 AM

Permit 1-2025-1246

KANSAS DEPARTMENT OF TRANSPORTATION

Bureau of Maintenance

Notifying the appropriate KDOT
representative at least 1 day prior to starting
work on the highway right of way is
MANDATORY. Work encountered without
prior notification will be shut down and right
of way vacated.
*** Permit may be REVOKED. ***

HIGHWAY PERMIT

USE OF RIGHT OF WAY

Route

K-7

Co.

ATCHISON

The beginning of the document. Download the full file to read on.

Other documents in this bid