Amendment 1: Keating Courthouse Hardening Phase II- Construction Request for Information RESPONSE
Updated
A PDF document (150 KB) attached to SOLICITATION NOTICE- Rochester, NY Courthouse Construction, from the Public Buildings Service. Due Oct 30, 2026, 5:00 PM (UTC-4).
File name: Amendment 1 Keating Courthouse Hardening Phase II- Construction RFI RESPONSE.pdf
The full file is for paid members, or buy this bid alone.
Preview
U.S. General Services Administration
August 31st, 2026
To:
All Contractors applicable to Solicitation Number:
47PC5326R0021, Keating Courthouse Hardening Phase IIConstruction
Subject:
Request for Proposal (RFP) 47PC5326R0021, Keating
Courthouse Hardening Phase II- Construction, Solicitation Pre-Bid RFI Responses
Amendment #1 is issued to provide answers to all questions received: 1. Will past performance on contracts awarded by the Department of Veterans
Affairs (VA) for occupied federal healthcare facility renovation and modernization be evaluated as relevant past performance under FAR 15.305(a)(2) for this solicitation?
RESPONSE: YES, ALL CONTRACTS AWARDED BY THE DEPARTMENT OF
VETERANS AFFAIRS (VA) FOR OCCUPIED FEDERAL HEALTHCARE FACILITY
RENOVATIONS AND MODERNIZATION CONSTRUCTION POJRECTS WILL BE
EVALUATED AS RELEVANY PAST PERFORMANCE.
2. Confirm whether existing vehicle gate operators, tracks, motors and controls
remain, are modified, or are replaced?
RESPONSE: REMAIN UNCHANGED.
3. Confirm approved tested ASTM F3038 assembly, manufacturer, attack level,
thickness and whether existing frames require reinforcement?
RESPONSE: RIOT GLASS SECURITY GLAZING PUBLISHED LABORATORY
DOCUMENTATION IDENTIFIES A 15-MINUTE ASTM F3038 FORCED-ENTRY TEST,
AND ITS J-SERIES COMPRESSION SUBFRAME IS DECLARED AS HAVING
PASSED ASTM F3038 FOR 15 MINUTES. J-SERIES SUBFRAME PROVIDES A
U.S. General Services Administration
SUITABLE MOUNTING STRUCTURE WHERE THE EXISTING FRAMING ISN'T
CONDUCIVE TO A RETROFIT. PROVIDE COMPLETE ASSEMBLY TESTED TO
ASTM F3038 FOR MINIMUM 15-MINUTE FORCED-ENTRY RESISTANCE IN
SUBMITTAL PHASE.
4. Identify existing access-control platform and required authorized programming
vendor.
RESPONSE: GALLAGHER IS THE EXISTING ACCESS CONTROL SYSTEM; SECURITY VENDOR SHALL BE GALLAGHER CERTIFIED.
5. Provide/confirm door hardware schedule and exact leaves/devices included in
entrance groups F1-F5.
RESPONSE: EXISTING DOOR SYSTEM TO RECEIVE NEW AUTOLOCK SYSTEM.
ALL DOOR HARDWARE, LEAVES, AND DEVICES TO REMAIN. REFER TO
SPECIFICATIONS FOR MORE INFORMATION.
6. Confirm footing diameter/depth/reinforcement by fence post, corner, terminal and
gate post.
RESPONSE: A REVISED STRUCTURAL DRAWING WITH SPECIFIC FOOTING
DETAILS WILL BE PROVIDED. THE STANDARD FOOTER SUPPLIED BY THE
FENCE MANUFACTURER SHOWN ON C-5 IS SUFFICIENT FOR THE NEW LOADS
ASSOCIATED WITH THE FENCE.
7. Confirm utility mark out and known conflicts along new fence/footing alignment.
RESPONSE: CONTRACTOR TO PERFORM AN IN-FIELD UTILITY ‘MARK OUT’
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Form
- Attachment 1: Statement of Work CHH P2
- Attachment 10: Wage Determination Monroe
- Attachment 11: Safeguarding and Dissemination of Controlled Unclassified Information CUI Building Information
- Attachment 4: Keating CHH Phase 2 Pre-Bid Addendum 1
- Attachment 6: PBS Past Performance Questionnaire
- Attachment 7: Key Personnel Form
- Attachment 9: Contractors Qual and Financial Info GSA527-21a
- SBSA GC Agreement - Keating Courthouse Hardening Phase II- Construction
- Solicitation - Keating Courthouse Hardening Phase II- Construction
- Executed Solicitation Amendment 1
- Executed Solicitation Amendment 2