Sol. Reference No. 47PC5326R0021

GSA Contract No: TBD

I.

Project Information

A. Project Summary

B. The Contract

C. Period Of Performance

D. Work Conditions/Site Requirements

E. Authorized Representatives

F. Contract Liquidated Damages Rate

G. Buy American Exceptions

H. Statement of Work, Specifications, Drawings

II.

Prices

A. Basis of Pricing

B. Contract Price Form

III.

Terms and Conditions

A. Contractor Responsibilities

B. Submittals

C. Finality of Contract Modifications

D. Liquidated Damages

E. Insurance Requirements

F. Order of Precedence

G. Administrative Matters

H. Non-Compliance with Contract Requirements

I. Requirements for GSA Information Systems

IV.

Contract Clauses

A. Clauses Incorporated in Full Text

1. FAR 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts (GSA Class Deviation RFO-2025-23) 2. FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items
3. GSAR 552.204-9 Personal Identity Verification Requirements 4. Far 52.240-91 Security Prohibitions and Exclusions (GSA Class Deviation RFO-2025-40)

5. Buy American Requirements

6. FAR 52.228-11, Pledges of Assets (DEVIATION)
7. FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors
8. FAR 52.219-14, Limitations on Subcontracting (GSA Class Deviation RFO-2025-19)
9. 52.222-90 Addressing DEI Discrimination by Federal Contractors

Document: C101-SB-GC/MAY 2026
(The Agreement)

Sol. Reference No. 47PC5326R0021

GSA Contract No: TBD

10. Additional Clauses

11. FAR 52.244-5, Competition in Subcontracting

B. Clauses Incorporated by Reference

C. Subcontract Requirements

Document: C101-SB-GC/MAY 2026
(The Agreement)

Sol. Reference No. 47PC5326R0021

GSA Contract No: TBD

I. Project Information

I.A. Project Summary
The Keating Courthouse Hardening Phase II- Construction project at the Kenneth B. Keating Federal Building located at 100 State St, Rochester, NY 14614 includes, but is not limited to providing all labor, materials, tools, and equipment necessary to make necessary improvements to the federal facility to meet the requirements as per the construction documents and supporting documents. The project will require work performed outside of an occupied building without disruption to the operations of the tenants. To support this project initiative, GSA requires a construction contractor to procure, supply, and furnish all materials and labor to implement the work set forth by the design documents, drawings and specifications. This project will be based on the