Amendment 3: Approved Plans
Updated
A PDF document (10.7 MB) attached to Reserve Basin Maintenance Dredging Contract for Sites at the Phildelphia Navy Yard in the Public Works Department Pennsylvania Area of Responsibiliy, from the Department of the Navy. Due Jan 15, 2027, 2:00 PM (UTC-5).
File name: AMEND0003 - Final Approved Plans E1-E5.pdf
The full file is for paid members, or buy this bid alone.
Preview
Path: G:\Federal\Northeast\Pennsylvania\Philadelphia_NavyYard_Dredging_6337002\PROJECTS\NavyYardDredging\NavyYardDredging.aprx | Figure 1-3 PotenƟal Disposal LocaƟons in PA and NJ | 7/24/2024 | kburdick
Biles Island CDF
er
Riv
are
w
a
l
De
Whites Rehandling Basin
2.5
Miles
Figure
Dredged Material Placement Locations
in Pennsylvania and New Jersey
Philadelphia Navy <DUG5HVHUYH
%DVLQPhiladelphia, Pennsylvania
Map Date: 7/24/2024
Source: ESRI 2024
Projection: NAD 1983 State Plane Pennsylvania South US Foot
E-1 Approved Plan
NAP-2024-00345-46
Potential Disposal Locations
Area of Dredging
Legend
Project Location
4E
PIER 4
4WA
4WB
RB-C
PIER 7
PIER 4
PIER 2
PIER 1
PIER 5
PIER 6
RESERVE BASIN
PHILADELPHIA
NAVY YARD
MIFFLIN
RB-A
AREA "A"
AREA "B"
FT.
/8
KEY PLAN: INSET 'A'
NORTH
RB-A7
#
#
DREDGE AREA
LABELS
LOCATION MAP
FORT MIFFLIN
PROJECT SITE
N
This project was designed by NAVFAC MIDLANT HYDROGRAPHIC BRANCH (PDC 45C) of the Naval Facilities Engineering Systems Command. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by NAVFACINST 3540.1E.
E-2 Approved Plan
NAP-2024-00345-46
VERTICAL DATUM - SOUNDINGS ARE IN FEET AND TENTHS AND ARE REFERRED TO THE NOAA MEAN LOWER LOW WATER DATUM (MLLW).
HYDROGRAPHIC NOTES
LIST OF SHEETS
SITE PLAN FOR:
FY 2026 MAINTENANCE DREDGING of RESERVE BASIN
PHILADELPHIA NAVY YARD - PHILADELPHIA, PA
Digitally signed by
GEORGO.JAMES.S.13927630
DN:
cn=GEORGO.JAMES.S.13927
63089 c=US o=U.S.
Government ou=USN
Date: 2026-05-20 17:18-04:00
V-001
FY 26 MAINTENANCE DREDGING
RESERVE BASIN - PHILADELPHIA NAVY YARD
RB-D
NAVAL FACILITIES ENGINEERING COMMAND ~ MID ATLANTIC
A
B
V-002
C
V-002
TRANSVERSE SECTION THROUGH RESERVE BASIN DREDGE AREA
TRANSVERSE SECTION THROUGH RESERVE BASIN DREDGE AREA
TRANSVERSE SECTION THROUGH ACCESS CHANNEL DREDGE AREA
CONTRACT DEPTHS AND OVERDREDGE DEPTHS SHOWN HEREIN REFER TO NOAA
MEAN LOWER LOW WATER DATUM (MLLW).
V-002
2.
CABLE
DANGER
SUBMERGED
CABLE
DANGER
SUBMERGED
E-3 Approved Plan
NAP-204-00345-46
DREDGING AND DESIGN NOTES
V-002
05-20-26 JSG
REVISED PER ACOE REVIEW COMMENTS
FY 26 MAINTENANCE DREDGING
RESERVE BASIN - PHILADELPHIA NAVY YARD
NAVAL FACILITIES ENGINEERING COMMAND ~ MID ATLANTIC
E
V-101
C
RB-
#
D
V-101
F
V-101
DREDGING PLAN - GRAPHIC SCALE
E-4 Approved Plan
NAP-204-00345-46
A
RB-
SECTION THROUGH DREDGING AT EXISTING 15 KV SUBMARINE CABLE
1. SOUNDINGS SHOWN ON THIS SHEET REFER TO NOAA MEAN LOWER LOW WATER DATUM (MLLW).
V-101
G
TRANSVERSE SECTION THROUGH ACCESS CHANNEL AT EXISTING 15 KV SUBMARINE CABLE
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment A - PNY RESERVE BASIN FY26 MAINTENANCE DREDGING Specifications
- Attachment B - PNY RESERVE BASIN FY26 MAINTENANCE DREDGING PLANS
- Attachment C - Bid Schedule
- Bid document
- Amendment 1
- Amendment 1: Updated Specifications
- Amendment 1: Request for Information Responses
- Amendment 2
- Amendment 3: Material Acceptance
- Amendment 3: NWP Letter (2026)
- Amendment 3: Rev Specifications Section 01 45 00
- Amendment 3