Attachment A - PNY RESERVE BASIN FY26 MAINTENANCE DREDGING Specifications
Updated
A PDF document (12.4 MB) attached to Reserve Basin Maintenance Dredging Contract for Sites at the Phildelphia Navy Yard in the Public Works Department Pennsylvania Area of Responsibiliy, from the Department of the Navy. Due Jan 15, 2027, 2:00 PM (UTC-5).
File name: Attachment A - 1783178 PNY RESERVE BASIN FY26 MAINTENANCE DREDGING SPECS.pdf
The full file is for paid members, or buy this bid alone.
Preview
eProjects WO#: 1783178
FY26 MAINTENANCE
DREDGING AT:
RESERVE BASIN
PHILADELPHIA NAVY YARD
PHILADELPHIA, PA
DESIGNED BY:
NAVFAC MID-ATLANTIC - PDC CORE
Hydrographic Team (PDC45C)
9080 VIRGINIA AVE
NAVAL STATION NORFOLK, BLDG CEP-188
NORFOLK, VIRGINIA 23511
Date: November 5, 2025
SPECIFICATION PREPARED BY: James S. Georgo, P.E.
Project Manager:
Steven A. McKechnie,P.E.
Chief Engineer:
Jonathan W. Jarrett, P.E.
SPECIFICATIONS APPROVED BY:
Lead Discipline Team Manager:
James S. Georgo, P.E.
Digitally signed by
GEORGO.JAMES.S.1392763089
Date: 2025.11.05 11:19:18 -05'00'
James S. Georgo, P.E.
For Commander, NAVFAC MID-ATLANTIC:
Design Production Director
Capital Improvements Core
Date
signed by
DONAHUE.JAME Digitally
DONAHUE.JAMES.E.1290785860
S.E.1290785860 Date: 2025.11.05 14:58:39 -05'00'
James E. Donahue, R.A.
Date
PNY Reserve Basin FY26 Maintenence Dredging
1783178
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15
LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00
01 14 00
01 20 00
01 30 00
01 31 23.13 20
02/24, CHG 1: 05/25
11/22, CHG 5: 05/25
11/20, CHG 5: 02/25
11/20, CHG 5: 02/25
08/23, CHG 1: 02/24
01 32 16.00 20
08/18, CHG 1: 08/20
01 33 00
01 35 26
01 42 00
01 45 00
01 50 00
08/18, CHG 4: 02/21
05/24, CHG 1: 05/25
08/23, CHG 2: 05/25
11/20, CHG 2: 08/22
01 57 19
01 74 19
02/19, CHG 3: 11/21
SUMMARY OF WORK
WORK RESTRICTIONS
PRICE AND PAYMENT PROCEDURES
ADMINISTRATIVE REQUIREMENTS
ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
SMALL PROJECT CONSTRUCTION PROGRESS
SCHEDULES
SUBMITTAL PROCEDURES
GOVERNMENTAL SAFETY REQUIREMENTS
SOURCES FOR REFERENCE PUBLICATIONS
QUALITY CONTROL
TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
TEMPORARY ENVIRONMENTAL CONTROLS
CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23
DREDGING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
PNY Reserve Basin FY26 Maintenence Dredging
1783178
DOCUMENT 00 01 15
LIST OF DRAWINGS
PART 1
1.1
GENERAL
SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications." 1.2
CONTRACT DRAWINGS
Contract drawings are as follows:
SHEET NO.
V-001
V-002
V-101
NAVFAC#
12902788
12902789
12902790
SHEET TITLE
TITLE SHEET
DETAIL SHEET
RESERVE BASIN - SOUTH
-- End of Document --
DOCUMENT 00 01 15
PNY Reserve Basin FY26 Maintenence Dredging
1783178
SECTION 01 11 00
SUMMARY OF WORK
02/24, CHG 1: 05/25
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment B - PNY RESERVE BASIN FY26 MAINTENANCE DREDGING PLANS
- Attachment C - Bid Schedule
- Bid document
- Amendment 1
- Amendment 1: Updated Specifications
- Amendment 1: Request for Information Responses
- Amendment 2
- Amendment 3: Approved Plans
- Amendment 3: Material Acceptance
- Amendment 3: NWP Letter (2026)
- Amendment 3: Rev Specifications Section 01 45 00
- Amendment 3