AOI RPR RPL HVAC SYSTEM BAY A and HEADHOUSE
Updated
A PDF document (254 KB) attached to FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BLDG 300 Bay A/Headhouse, from the Department of the Air Force. Due Nov 16, 2026, 3:00 PM (UTC-5).
File name: AOI_ FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BAY A and HEADHOUSE_110326.pdf
The full file is for paid members, or buy this bid alone.
Preview
FA8501-27-RAPID-RPR RPL HVAC B301-OTA
Under the RAPID Umbrella Framework: UHHZ990029 RAPID RPR RPL HVAC SYSTEM,
BAY A & HEADHOUSE/ROOF (HEADHOUSE), BLDG 300 at Robins AFB, GA
Description
The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a. The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to repair, modernize, and sustain critical HVAC and associated interior building systems within Facility 300 at Robins Air Force Base, Georgia. The requirement includes replacement or modernization of end-of-life HVAC equipment; improvements necessary to provide reliable climate control and energy-efficient operations; and associated interior work to address accessibility barriers, lead-based paint, asbestos-containing flooring, degraded finishes, and workspace configuration. The supporting work is necessary to improve occupant safety, facility reliability, code compliance, and uninterrupted mission operations for Facility 300’s critical multi-tenant organizations.
This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a. Purpose
The purpose of this Area of Interest is to identify commercially viable, safe, resilient, and schedule-credible solutions to repair and modernize the heating, ventilation, and air-conditioning (HVAC) and associated interior building systems within Facility 300 at Robins Air Force Base, Georgia.
The Government seeks an integrated approach that restores reliable environmental control; addresses end-of-life HVAC equipment; and supports remediation or modernization of affected interior conditions, including lead-based paint, asbestos-containing flooring, accessibility barriers, and degraded workspace configurations. The selected approach must sustain uninterrupted operations for Facility 300’s multi-tenant mission partners—including supplychain management, network support, special operations/rotary-wing management, and C-5 cargo aircraft management—while improving energy performance, occupant safety, accessibility, maintainability, and compliance with applicable safety, energy, and Unified Facilities Criteria
The beginning of the document. Download the full file to read on.