Corrected Specifications
Updated
A PDF document (8.7 MB) attached to FA8501-27-RAPID-990029 RPR RPL HVAC SYSTEM BLDG 300 Bay A/Headhouse, from the Department of the Air Force. Due Nov 16, 2026, 3:00 PM (UTC-5).
File name: 3b. UHHZ990029 - Corrected Final Specifications.pdf
The full file is for paid members, or buy this bid alone.
Preview
CF-IFC DESIGN SPECIFICATIONS
CCR RPR/RPL HVAC SYSTEM,
BAY A & HEADHOUSE/ROOF
(HEADHOUSE), B300
ROBINS AFB, GEORGIA
Contract No.: FA850122D0003
Delivery Order No: FA850123F0119
Project No.: UHHZ99-0029
Prepared for:
Robins Air Force Base, GA
Civil Engineer Group (CEG)
by:
6302 FAIRVIEW ROAD, SUITE 600
Charlotte, NC 28210
NOVEMBER 2024
THIS PAGE INTENTIONALLY LEFT BLANK
Date: NOVEMBER 2024
Architectural and Engineering
Stamps and Seals
Project Name: UHHZ990029 – RPR/RPL HVAC SYSTEM
Client: Robins Air Force Base
Contract Number: FA850122D0003
Task Order Number: FA850123F0019
Task Order Number: 2202-07-01-10130-S
Structural
Corporate
Architectural
Fire Protection
Electrical
Mechanical
Roofing
Plumbing
THIS PAGE INTENTIONALLY LEFT BLANK
CCR RPR/RPL HVAC SYSTEM
BAY A & HEADHOUSE/ROOF, B300
ROBINS AIR FORCE BASE
GEORGIA
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 50
01 04 00
REV 05/17
01 30 00
01 31 00
01 42 00
01 50 10
01 54 00
01 56 00
01 58 00
01 60 00
01 65
70 50
01 70 00
01 73 00
SOW Sole Source Current
SITE REQUIREMENTS (01040 RAFB)
SUBMITTALS AND CONTRACTOR-FURNISHED
ITEMS (RAFB 01300)
CADD AS-BUILT DRAWINGS (RAFB 01310)
SOURCES FOR REFERENCE PUBLICATIONS
TEMPORARY SERVICES - CONTRACTOR (RAFB
01501)
GREEN PROCUREMENT (RAFB 01540)
ENVIRONMENTAL REQUIREMENTS FOR ROBINS
AIR FORCE BASE (RAFB 01560)
SAFETY REQUIREMENTS (RAFB 01580)
PRODUCT REQUIREMENTS (RAFB 01600)
EXECUTION
REQUIREMENTS (RAFB 01700)
Phasing
OPERATIONS
AND MAINTENANCE
DATA
(RAFB
EXECUTION REQUIREMENTS
(RAFB
01700)
01730)
OPERATIONS AND MAINTENACE DATE (RAFB 01730)
DIVISION 02 - EXISTING CONDITIONS
02 41 00
02 81 00
02 82 00
02 83 00
02 84 16
02 85 00
DEMOLITION
TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
11/18, CHG 1: 11/19 ASBESTOS REMEDIATION
LEAD REMEDIATION
HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
11/18, CHG 1: 05/22 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00
11/15, CHG 2: 05/19 UNIT MASONRY
DIVISION 05 - METALS
05 12 00
05 40 00
05 52 00
08/18, CHG 2: 05/21 STRUCTURAL STEEL
05/15, CHG 1: 08/18 COLD-FORMED METAL FRAMING
02/18, CHG 1: 02/20 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 41 16.00 10
06 61 16
08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50
07 14 00
07 16 19
07 21 13
07 21 16
07 54 19
02/12, CHG 2: 02/18
02/16, CHG 2: 08/20
11/11, CHG 4: 08/18
PREPARATION FOR REROOFING
FLUID-APPLIED WATERPROOFING
METALLIC OXIDE WATERPROOFING
The beginning of the document. Download the full file to read on.