STATEMENT OF OBJECTIVE

Build Only via Other Transactional Authority

01005

1. PURPOSE AND BACKGROUND

1.1. Objective: The objective of this project is to provide all labor, material, plant, equipment, supplies, and coordination required to execute the construction of Project UHHZ990029 – RPR/RPL HVAC SYSTEM, BAY A & HEADHOUSE/ROOF (HEADHOUSE), B300 at Robins AFB, GA, utilizing a 100% Government-furnished design. All engineering, plumbing, HVAC, and electrical work required must be accomplished by personnel and/or businesses with a Georgia License.
1.2. Background: Facility 300 (constructed in 1942) is a critical multi-tenant facility supporting several key Department of War (DoW) missions, including the 448 SCMG (Supply Chain Management Group), 78 ABW IT (Zone 4/5 network support), LCMC/WIUW (Special Operations/Rotary management), and LCMC/WLS (C-5 cargo aircraft management). Sustainable, modern facility systems are essential to maintain uninterrupted operations for these critical national security and logistics missions. The building systems are severely degraded. The HVAC units have exceeded their lifecycle, resulting in frequent failures, high maintenance costs, and inadequate climate control. Walls have peeling lead-based paint, and degraded flooring under the carpet contains asbestos. The basement east section is currently inaccessible under ADA standards. This project repairs and modernizes Building 300 workspace to prevent safety hazards (slips/falls), optimize interior space configuration, improve occupant morale, and ensure compliance with energy, safety, and UFC codes.
The building 300 will remain in partial operation during the entire duration of the project. 1.3. OTA & RAPID Framework Approach: This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Build-Only execution approach under the standalone statutory authority of 10 U.S.C. § 2808a.
Because the Government has provided a 100% completed design package and/or specific phasing and repair requirements, this project does not contain a collaborative design-builder phase. Instead, it transitions directly to rapid construction execution under a Firm-Fixed-Price (FFP) structure to bypass administrative procurement lag

2. EVALUATION AND SELECTION CRITERIA

2.1. Overview

The Government will utilize a two-step, Best-Value selection process mapped to the RAPID framework to select