Home / Contractor-Hosted Fully Integrated Records Facility (FIRF)… / Document

Appendix 3A-Addendum to Physical Security Requirements

Updated

A PDF document (59 KB) attached to Contractor-Hosted Fully Integrated Records Facility (FIRF) IDIQ, from the Food and Drug Administration. Due Oct 29, 2026, 2:00 PM (UTC-4).

File name: Appendix 3A-Addendum to Physical Security Requirements.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Addendum to ID/IQ Appendix#2: Physical Security Requirements/Specifications for FDA Facilities

The following items contained in Section I. FDA Sole Occupant are not applicable: 1) Garage Area (Inside Parking);
2) Secured Area for Government Vehicles;
3) Perimeter Parking; and
4) Guard Service.

Intrusion Detection/Access Control System contained in Section II. FDA Occupant in Multi-Tenant Building is revised to state:

INTRUSION DETECTION/ACCESS CONTROL SYSTEM

1) Card readers will be utilized on all perimeter door entrances. 2) Intrusion alarms, door contacts, and window sensors will be utilized to protect all FDA space. 3) Video intercoms with remote release stations may be utilized. 4) Connected to FDA Physical Security Access Control System.

The beginning of the document. Download the full file to read on.

Other documents in this bid