Atch 6 - Past Performance Worksheet DPAA PNG
Updated
A Word document (35 KB) attached to DPAA Papua New Guinea Helicopter Requirement, from the US Transportation Command (ustranscom). Due Nov 2, 2026, 4:00 PM (UTC-6).
File name: Atch 6 - Past Performance Worksheet DPAA PNG.docx
The full file is for paid members, or buy this bid alone.
Preview
HTC71126RE147 DPAA PNG
Attachment 6: Past Performance Worksheet
Instructions to Offerors:
Quantity Limits: Submit at least two (2), but no more than four (4) references. (Submit a separate worksheet for each reference). Relevancy Focus: The Offeror must provide a clear, evidence-based justification demonstrating how the referenced contract directly satisfies the Government’s specific definitions for Scope, Magnitude, and Complexity. The narrative justification must be entered directly within the designated response highlighted area below each definition.
PART I: CONTRACT & POINT OF CONTACT (POC) DATA
Contract Name / Title
Contract Number & Task Order
Name of Contracting Agency / Client
Total Contract Value (Inc. Options)
$
Period of Performance (Start – End)
Primary Reference POC Name & Title
Reference POC Phone & Email
PART II: RELEVANCY JUSTIFICATION
1. SCOPE JUSTIFICATION
Government Definition:
Aviation Operations: Rotary-wing (helicopter) flight services executing both passenger transportation and cargo movement. Mission Planning: Direct collaboration with client planners to develop, coordinate, and execute flight mission plans. Emergency Response: Maintenance of active, on-call MEDEVAC or emergency response flight capabilities. Operational Contingency: Direct execution of aircraft maintenance programs and the active provision of equivalent substitute aircraft to ensure zero mission interruption. Offeror Narrative (Explain HOW this contract meets the Scope definition)
2. MAGNITUDE JUSTIFICATION
Government Definition:
Mission Frequency: Supporting one (1) to three (3) distinct operational deployments/missions per year. Mission Duration: Executing sustained flight operations where each deployment/mission lasted between 14 and 90 consecutive days. Fleet Scale: Simultaneously supporting and operating up to three (3) concurrent primary aircraft (including both single and twin-engine configurations) along with designated alternate/substitute aircraft capability. Financial Value: The past performance reference had a Total Contract Value (including all options) of at least $5,000,000. Offeror Narrative (Explain HOW this contract meets the Magnitude definition)
3. COMPLEXITY JUSTIFICATION
Government Definition:
Austere Environments: Flight operations conducted in remote, mountainous (elevations exceeding 5,000 feet), dense jungle, island, or overwater OCONUS environments subject to rapidly changing weather. Limited Infrastructure: Executing flight operations and maintenance from auxiliary or remote locations with little to no established airport or ground support infrastructure.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Atch 3 - Aircraft Identification Sheet
- Atch 5 - Technical Capability Worksheet DPAA PNG
- Atch 7 - Past Performance Questionnaire DPAA PNG
- Atch 8 - Basic Eligibility and Carrier Flag Status DPAA PNG
- Atch 9 - Offeror Information Sheet DPAA PNG
- Solicitation
- Pre-Proposal Conference Memo DPAA
- Attachment 4a Addendum SubContract DPAA PNG
- DPAA PNG QA1
- Atch 1- Performance Work Statement Track Changes
- Atch 4 - Business Compliance Checklist OCT
- DPAA Amendment 2 VENDOR SIGN