Home / DPAA Papua New Guinea Helicopter Requirement / Document

Attachment 4a Addendum SubContract DPAA PNG

Updated

A PDF document (107 KB) attached to DPAA Papua New Guinea Helicopter Requirement, from the US Transportation Command (ustranscom). Due Nov 2, 2026, 4:00 PM (UTC-6).

File name: Attachment 4a Addendum SubContract DPAA PNG.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

SOURCE SELECTION INFORMATION — SEE FAR 2.101 AND 3.104

(When filled-in, this Document becomes CUI//SP-SSEL)

HTC71126RE147 DPAA PAPUA NEW GUINEA

ATTACHMENT 4a: Addendum SUBCONTRACTOR PERFORMANCE PLAN

Company Name of Prime
Instructions: Offerors must fully disclose their subcontracting arrangements. Complete this form for each principal subcontractor responsible for flight operations, maintenance, or critical logistics. This plan must provide the Government with a clear understanding of how the work will be accomplished.

PART 1: SUBCONTRACTING INTENT

Does the Prime Offeror intend to utilize subcontractors to perform any portion of this contract?
•

[ ] NO. The Prime Offeror will self-perform 100% of all work. (If No, skip to Part 4).

•

[ ] YES. The Prime Offeror will utilize subcontractors. (If Yes, complete Part 2 and Part 3 for each principal subcontractor).

PART 2: PRINCIPAL SUBCONTRACTOR IDENTIFICATION

Subcontractor Company

PART 3: SUBCONTRACTOR PERFORMANCE NARRATIVE

Instructions: For the subcontractor identified above, provide a detailed narrative explaining how they will perform their designated role.

A. Detailed Scope of Work:

Describe the specific tasks and responsibilities this subcontractor will perform (e.g., provide and operate Helo 3 aircraft, perform all field-level maintenance, manage all remote fuel staging and logistics).

SOURCE SELECTION INFORMATION — SEE FAR 2.101 AND 3.104

(When filled-in, this Document becomes CUI//SP-SSEL)

B. Key Resources and Capabilities:

Describe the key personnel, equipment, facilities, and resources this subcontractor will use to perform their work. For flight operators, list specific aircraft tail numbers. For maintenance providers, describe facilities and key personnel qualifications.

C. Management and Oversight Plan:

Describe how the Prime Offeror will manage, oversee, and integrate this subcontractor to ensure full compliance with all PWS requirements, safety standards, and reporting deliverables.
D. Mandatory Certifications (If providing Flight Operations): If this subcontractor will have operational control of aircraft, confirm they hold the following:
•

DoD CARB Approval: [ ] Yes [ ] No

•

CASA PNG AOC: [ ] Yes [ ] No

E. Past Performance (If providing Flight Operations):
•

Past Performance Submission Attachment 6 completed and attached: [ ] Yes [ ] No

•

Past Performance Submission Attachment 7 completed and sent: [ ] Yes [ ] No

PART 4: SMALL BUSINESS SUBCONTRACTING PLAN (FAR 52.219-9)

This section applies to the Prime Offeror.
•

[ ] SMALL BUSINESS EXEMPTION: The Prime Offeror is a Small Business concern. A

The beginning of the document. Download the full file to read on.

Other documents in this bid