Attachment C: Anteroom and ICRA Layout Diagram
Note: This drawing outlines ICRA requirements that the contractor is responsible for installing and maintaining.
The contractor shall install the anteroom and related ICRA requirements as described below and outlined within the Statement of Work.
Point A: This point depicts the location of the anteroom. Point B: This is the pathway for HEPA exhaust. Utilize the window in room 4216. After work has been completed, the contractor shall restore the window to its original condition. Point C: This is a exit route into Stairwell 1W-2. This doorway shall be closed down with appropriate construction signage and containment barriers to keep staff from entering or exiting. Construction signage is required on the stairwell side of the exit door.
Point D: This doorway shall remain closed and be secured with appropriate barriers and construction signage.
Point E: This doorway shall remain closed and be secured with appropriate barriers and construction signage. Point F: This is the entrance into the jobsite from the anteroom. Zip barriers or hard containment doors are required here. Permits, ILSMs, and contractor contact information shall be displayed here. Point G: This will serve as the jobsite entrance. The containment wall built in this position shall have hard containment walls with a lockable door to restrict access. The contractor shall provide keys or codes used to secure this door to the Contracting Officer Representative. The containment wall shall extend from the floor to the ceiling or hard deck.
Point H: This doorway shall remain closed and be secured with appropriate barriers and construction signage.
Point I: This doorway shall remain closed and be secured with appropriate barriers and construction signage.