DEPARTMENT OF VETERANS AFFAIRS
VA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO
00 01 15
DIVISION AND SECTION TITLES
DIVISION 00 - SPECIAL SECTIONS
DATE
List of Drawing Sheets
05-2020
01 00 00
01 33 23
01 35 26
01 42 19
01 57 19
01 74 19
01 81 13
DIVISION 01 - GENERAL REQUIREMENTS
General Requirements
Shop Drawings, Product Data, And Samples
Safety Requirements
Reference Standards
Temporary Environmental Controls
Construction Waste Management
Sustainable Construction Requirements
06-2026
03-2026
05-2024
11-2020
01-2021
04-2022
10-2017
02 41 00
02 82 11
02 82 13.19
DIVISION 02 – EXISTING CONDITIONS
Demolition
Traditional Asbestos Abatement
Asbestos Floor Tile and Mastic Abatement
08-2017
01-2021
06-2026
09 65 16
DIVISION 09 – FINISHES
Resilient Sheet Flooring
06-2022
00 01 10-1
05-01-20
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No.
Title
Drawing 1 Buildings 1-4
- - - END - - -
00 01 15 - 1
11-01-21
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1
SAFETY REQUIREMENTS
A. Refer
to section 01 35 26, SAFETY REQUIREMENTS for safety
and infection control requirements.
1.2
GENERAL INTENTION
A. Contractor
shall completely prepare site for building
operations, including demolition and removal of existing structures, and furnish labor and materials and perform
work for Replace Operating Room 5 Flooring as required by drawings and specifications.
B. Visits
to the site by Bidders may be made only by
C. Before
placement and installation of work subject to tests
appointment with the Contracting Officer Representative.
by testing laboratory retained by Department of Veterans
Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of
specimens and field inspection. Such prior notice shall be
not less than three workdays unless otherwise designated by the COR.
D. All
employees of general contractor and subcontractors
shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3
STATEMENT OF BID ITEM(S)
A. ITEM
I, Work includes providing all labor, materials,
tools, equipment, and the necessary supervision to remove
01 00 00 -1
11-01-21
and replace the flooring and subflooring in Operating Room #5, located in Room 4211, Building 1W.
1.4 SPECIFICATIONS
A. Drawings
AND DRAWINGS FOR CONTRACTOR
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Atch A.1 Statement of Work - 11 pages
- Atch A.2 Statement of Work Attachment A - 1 page
- Atch A.4 Statement of Work Attachment C - 2 pages
- Atch A.6 Statement of Work Attachment E - 78 pages
- Atch E VAAR 852.219-75 Limitations on Subcontracting Cert of Compliance - 2 pages
- Atch F VA6500 Appendix C 1-5 - 2 pages