ADDENDUM NO. 1 - ITEMIZED CHANGES
HAVO 326181 - Addendum Log | Solicitation 140P2026R0091
Item No.
Document Type
Sheet No. / Spec
Section
Sheet / Section Title
Location / Reference
(detail, note, paragraph, Change Type
grid)
Specifications
01 11 00
Summary of Work
1.5 B
Revise
Drawing
E10
Floor Plan - Bldg 241 Electrical Lighting
Keynote 2
Revise
Remove GNSS station and equipment as government
furnished material.
Remove exterior junction box with a keynote #2 and
keynote #2 itself.
Reason / Source
(RFI, Owner, Code,
etc.)
Accompanying
Attachment
RFI-01
No
RFI-01
No
Provide (12) 40' temporary storage containers for use by NPS for the duration of the project. Prior to placing
containers, prepare the ground surface by placing 6" of aggregate base course. Provide a compact and level
surface. Maintain access to temporary and existing
storage containers for NPS staff. Temporary containers
Add requirements for base course prep under
shall be removed from site after NPS moves contents RFI-05 the temporary storage containers.
into finished Buildings 43 and 241. Upon removal of the temporary containers, restore the area so that final grade generally matches the adjacent existing grade. Aggregat base course may be removed, redistributed, or
otherwise regraded as necessary to achieve final
condition.
No
Drawing
G11
Staging & Access Plan
Specifications
09 65 00
Reslient Base
Add
Added missing spec section
RFI-07
Yes
Specifications
09 67 23
Resinous Flooring
Add
Added missing spec section
RFI-07
Yes
Specifications / Drawings 22 40 00 / P4
RFI-24
No
Specifications
01 11 40
Resource Protection Work Restrictions
Drawings
C61-C62
Sanitary Sewer Improvements Bldg 43, Sanitary Sewer
Details
Water Treatment System Improvements Process Flow
Diagram, Outfall Pipe Penetration Detail
Schedule
Revise
Revised Text / Direction
Plumbing Fixture Schedule
Note 5
Original Text / Condition
Revise
3.2.I.4
Revise
Note 1
Revise
Wall hung, 1.28 gpf manual flushometer,
vitreous china, back spud, ada mounting heightWater closet shall be a floor mount fixture, basis of design Sloan 2029.
Sloan ST - 2469
Added requirements for what needs to be
included in request for inspection.
Drawings
C51, C54, C55,
8/C59
Pipe between Rainsheds
Revise
and Ground Catchments
Specifications
01 27 00
Definition of Contract Line Items
3.1.A.1
Revise
remove "repair" for Tanks 1 through 4
New 24-in corrugated HDPE pipe
Drawings
C2
Site Demo Plan I
Note 12
Revise
Establish common proposal assumption for
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Att HAVO 26-0908 Project Specifications
- Att Solit PSP Vol II SubKPlan
- Att Hazardous Material Survey HAVO Rainshed Enviroquest
- Att - Geotechnical Data Report - HAVO Rainsheds Shear Wave Velocity Survey
- Att - Geotechnical Report HAVO Rehabilitate Water Treatment System
- Att HAER Drawings HAVO Rainshed
- Att HAER HAVO Water Collection System report
- Att HAVO Construction Phasing Memo
- Att Redwood Water Tanks Trip Rpt and Prelim Treat Recs 2018
- Sol
- Att HAVO - Site Walk Requirements 0001
- Sol Amendment 0001