Home / HAVO 326181 Rehabilitate Rainshed&Water Treatment / Document

Att A-E-Technical-Addendum 0003

Updated

A PDF document (106 KB) attached to HAVO 326181 Rehabilitate Rainshed&Water Treatment, from the National Park Service. Due Nov 20, 2026, 4:00 PM (UTC-10).

File name: B09_Att_(17)_A-E-Technical-Addendum_0003.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

ADDENDUM NO. 1 - ITEMIZED CHANGES

HAVO 326181 - Addendum Log | Solicitation 140P2026R0091

Item No.

Document Type

Sheet No. / Spec
Section

Sheet / Section Title

Location / Reference
(detail, note, paragraph, Change Type
grid)

Specifications

01 11 00

Summary of Work

1.5 B

Revise

Drawing

E10

Floor Plan - Bldg 241 Electrical Lighting

Keynote 2

Revise

Remove GNSS station and equipment as government
furnished material.
Remove exterior junction box with a keynote #2 and
keynote #2 itself.

Reason / Source
(RFI, Owner, Code,
etc.)

Accompanying
Attachment

RFI-01

No

RFI-01

No

Provide (12) 40' temporary storage containers for use by NPS for the duration of the project. Prior to placing
containers, prepare the ground surface by placing 6" of aggregate base course. Provide a compact and level
surface. Maintain access to temporary and existing
storage containers for NPS staff. Temporary containers
Add requirements for base course prep under
shall be removed from site after NPS moves contents RFI-05 the temporary storage containers.
into finished Buildings 43 and 241. Upon removal of the temporary containers, restore the area so that final grade generally matches the adjacent existing grade. Aggregat base course may be removed, redistributed, or
otherwise regraded as necessary to achieve final
condition.

No

Drawing

G11

Staging & Access Plan

Specifications

09 65 00

Reslient Base

Add

Added missing spec section

RFI-07

Yes

Specifications

09 67 23

Resinous Flooring

Add

Added missing spec section

RFI-07

Yes

Specifications / Drawings 22 40 00 / P4

RFI-24

No

Specifications

01 11 40

Resource Protection Work Restrictions

Drawings

C61-C62

Sanitary Sewer Improvements Bldg 43, Sanitary Sewer
Details
Water Treatment System Improvements Process Flow
Diagram, Outfall Pipe Penetration Detail

Schedule

Revise

Revised Text / Direction

Plumbing Fixture Schedule

Note 5

Original Text / Condition

Revise

3.2.I.4

Revise

Note 1

Revise

Wall hung, 1.28 gpf manual flushometer,
vitreous china, back spud, ada mounting heightWater closet shall be a floor mount fixture, basis of design Sloan 2029.
Sloan ST - 2469

Added requirements for what needs to be
included in request for inspection.

Drawings

C51, C54, C55,
8/C59

Pipe between Rainsheds
Revise
and Ground Catchments

Specifications

01 27 00

Definition of Contract Line Items

3.1.A.1

Revise

remove "repair" for Tanks 1 through 4

New 24-in corrugated HDPE pipe

Drawings

C2

Site Demo Plan I

Note 12

Revise

Establish common proposal assumption for

The beginning of the document. Download the full file to read on.

Other documents in this bid