FACILITY ENHANCEMENT

AND

MAINTENANCE

IDIQ

Statement of Work
628 Civil Engineering Squadron

JOINT BASE LINDSEY GRAHAM, SOUTH CAROLINA

20 August 2026

Part 1: Statement of Work (SOW)
•

•

•

•

SECTION 1: GENERAL INFORMATION

• 1.1. SCOPE OF WORK

• 1.2. LOCATION

• 1.3. PERIOD OF PERFORMANCE

• 1.4. REGULATIONS AND STANDARDS

SECTION 2: GENERAL CONTRACTOR REQUIREMENTS

• 2.1. TASK ORDER MANAGEMENT

• 2.2. WORK SITE MANAGEMENT

• 2.3. HAZARDOUS MATERIALS

SECTION 3: SPECIFIC TASK REQUIREMENTS

• 3.1. FLOOR COVERING TASKS

• 3.2. PROTECTIVE COATING TASKS

• 3.3. MAINTENANCE AND REPAIRS TASKS

SECTION 4: ATTACHMENTS

• Attachment A: Estimated Quantities
• Attachment B: Applicable Publications
• Attachment C: Work Order Form

Part 2: General Requirements

• 1.0 CONTRACT DESCRIPTION

• 2.0 WORK BY THE GOVERNMENT

• 3.0 PERFORMANCE CAPABILITIES

• 4.0 MANAGEMENT PLAN

• 5.0 CONSTRUCTION REQUIREMENTS

• 6.0 QUALITY CONTROL (QC)

• 7.0 PROTECTION OF CONTRACTOR'S EQUIPMENT & GOVERNMENT

PROPERTY

• 8.0 PROVISIONS ON CONTRACTING OFFICER'S AUTHORITY

• 9.0 DELIVERY ORDER PRICING

• 10.0 COMMUNICATION

• 11.0 PRE-PERFORMANCE CONFERENCES

• 12.0 ORDERING PROCEDURES

• 13.0 COMMENCEMENT, PROSECUTION, COMPLETION & PAYMENT FOR

WORK

• 14.0 WEATHER DAYS

• 15.0 HOURS OF WORK

• 16.0 JOBSITE VERIFICATION/GOVERNMENT-FURNISHED RECORD

DRAWINGS

• 17.0 MATERIAL SUBMITTALS & SHOP DRAWINGS

• 18.0 PERMITS

• 19.0 EXCAVATION

• 20.0 TESTING OF MATERIALS

•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•

21.0 PRE-FINAL & FINAL INSPECTIONS

22.0 WARRANTY

23.0 PROJECT SCHEDULING & COORDINATION

24.0 COORDINATING WITH GOVERNMENT ACTIVITIES

25.0 NOISE CONTROL

26.0 CONSTRUCTION SITE MAINTENANCE

27.0 CONTRACTOR PARKING

28.0 TRANSPORTATION OF CONSTRUCTION EQUIPMENT

29.0 BASE FIRE REGULATIONS

30.0 SECURITY REQUIREMENTS

31.0 AREAS WITH SPECIAL CONDITIONS

32.0 WORK IN SPECIAL SECURITY AREAS

33.0 SAFETY AND HEALTH

34.0 EXPLOSIVE OPERATED HANDTOOLS

35.0 CONTRACTOR'S USE OF ELECTROMAGNETIC EMISSION DEVICES

36.0 WEAPONS STORAGE AREAS AND CONVENTIONAL STORAGE AREAS

37.0 USE OF TOBACCO

38.0 INAPPROPRIATE WORKER BEHAVIOR

39.0 COMPLETION OF CONTRACT

40.0 PARTNERING

41.0 GOVERNMENT FURNISHED SERVICES

42.0 EMERGENCIES

43.0 SEVERE WEATHER

44.0 TEMPORARY CONSTRUCTION MEASURES

45.0 HAZARDOUS MATERIAL

Part 1: Statement of Work (SOW)

SECTION 1: GENERAL INFORMATION

1.1. SCOPE OF WORK

This Statement of Work (SOW) outlines the requirements for various facility enhancement and maintenance services. The contractor shall provide all management, labor, materials, equipment,

The beginning of the document. Download the full file to read on.