Statement of Work
Facility Enhancement & Maintenance IDIQ (FEM)
PROTECTIVE COATING
Building 325 – Air Base Commons
100 Hill Blvd., Joint Base Lindsey Graham, SC
June 2026
GENERAL: The work to be performed is water blasting of approximately 37,830 SF of identified areas. Identified areas include: the brick building, sidewalks, curbs, patio, utility boxes, gutters, downspouts, flashing/eaves, awnings, doors, bollards and light poles (excluding the roof). Preparing and painting of approximately 4,075 square feet of metal surfaces and 252 square feet of wood surfaces. The contractor shall provide all labor, materials, equipment, tools, transportation, and storage for protective coating materials to perform the work requested. (Section 3.2)
LOCATION: Building 325, 100 Hill Blvd., Joint Base Lindsey Graham, SC. SCOPE OF WORK: The work includes but is not limited to the following items:
1. Surface Preparation & Painting:
Contractor shall prep all surfaces identified to accept paint. Areas not requiring painting shall be protected by the contractor to ensure no damage occurs. (Section 3.2.1)
2. Protective Coating Application:
Contractor shall apply paint in accordance with paint product technical installation instructions and specifications. (Section 3.2.2 & 3.2.3) Paint colors will be identified by Facility Manager and COR and in accordance with Air Force Corporate Facility.
The following colors are approved for use per the Sherwin-Williams Paint Pallet: Exterior Colors
Base Color: Sherwin Williams 6119 (Antique White) or equivalent. Trim Color: Sherwin Williams 2007 (Nightscape) or equivalent. Applicable Instructions:
Work areas may be occupied by the employees while work is being accomplished. Caution must be taken to ensure all safe work practices are adhered to. Caution shall be taken to prevent damage to the wall surfaces during removal process. All work shall be in accordance with applicable federal, state, and local regulations, specifications, commercial practices, manufacture specifications, and industry standards. Low VOC materials shall be used, and work areas shall be well ventilated. Contractor shall keep a clean work area daily. -End-
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: Statement of Work
- Attachment 10: JB CHS Approved Paint Colors
- Attachment 12: UFC Protective Coatings and Paints
- Attachment 13: USAF Carpet Ordering Guide
- Attachment 14: Sample Project Statement of Work (Floorcovering)
- Attachment 16: Sample Project Statement of Work (Misc Repairs)
- Attachment 19: Instructions to Offerors (Section L)
- Attachment 20: Evaluation Factors (Section M)
- Attachment 3: Orangeburg
- Attachment 4: Berkeley
- Attachment 5: Charleston
- Attachment 6: Dorchester