Home / Facility Enhancement and Maintenance IDIQ / Document

Attachment 15: Sample Project Statement of Work (Protective Coating)

Updated

A PDF document (106 KB) attached to Facility Enhancement and Maintenance IDIQ, from the Department of the Air Force. Due Nov 5, 2026, 4:30 PM (UTC-5).

File name: Attachment 15 - Sample Project SOW (Protective Coating).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Statement of Work
Facility Enhancement & Maintenance IDIQ (FEM)

PROTECTIVE COATING

Building 325 – Air Base Commons
100 Hill Blvd., Joint Base Lindsey Graham, SC
June 2026
GENERAL: The work to be performed is water blasting of approximately 37,830 SF of identified areas. Identified areas include: the brick building, sidewalks, curbs, patio, utility boxes, gutters, downspouts, flashing/eaves, awnings, doors, bollards and light poles (excluding the roof). Preparing and painting of approximately 4,075 square feet of metal surfaces and 252 square feet of wood surfaces. The contractor shall provide all labor, materials, equipment, tools, transportation, and storage for protective coating materials to perform the work requested. (Section 3.2)
LOCATION: Building 325, 100 Hill Blvd., Joint Base Lindsey Graham, SC. SCOPE OF WORK: The work includes but is not limited to the following items:

1. Surface Preparation & Painting:

Contractor shall prep all surfaces identified to accept paint. Areas not requiring painting shall be protected by the contractor to ensure no damage occurs. (Section 3.2.1)

2. Protective Coating Application:

Contractor shall apply paint in accordance with paint product technical installation instructions and specifications. (Section 3.2.2 & 3.2.3) Paint colors will be identified by Facility Manager and COR and in accordance with Air Force Corporate Facility.
The following colors are approved for use per the Sherwin-Williams Paint Pallet: Exterior Colors
Base Color: Sherwin Williams 6119 (Antique White) or equivalent. Trim Color: Sherwin Williams 2007 (Nightscape) or equivalent. Applicable Instructions:
Work areas may be occupied by the employees while work is being accomplished. Caution must be taken to ensure all safe work practices are adhered to. Caution shall be taken to prevent damage to the wall surfaces during removal process. All work shall be in accordance with applicable federal, state, and local regulations, specifications, commercial practices, manufacture specifications, and industry standards. Low VOC materials shall be used, and work areas shall be well ventilated. Contractor shall keep a clean work area daily. -End-

The beginning of the document. Download the full file to read on.

Other documents in this bid