Statement of Work
Facility Enhancement & Maintenance IDIQ (FEM)
FLOORCOVERING
Building 325 – Air Base Commons
100 Hill Blvd., Joint Base Lindsey Graham, SC
June 2026
GENERAL: The work to be performed is the removal and installation of approximately 8,028 square feet of floor covering. The contractor shall provide all labor, materials, equipment, tools, transportation, and storage for floor covering materials to perform removal and replacement of floor covering, including furniture relocation.
LOCATION: Building 325, 100 Hill Blvd., Joint Base Lindsey Graham, SC. SCOPE OF WORK: The work includes but is not limited to the following items: 1. Contractor shall lift and relocate existing furniture and appliances to facilitate the installation of the new materials. (Section 3.1.1)
a. Relocate approx. 1 ea. system furniture – Removable Stage. b. Remove approx. 8,028 sq. ft. of floor covering. (Section 3.1.2) 2. Contractor shall prepare the floor to acceptable industry standard as per new floor covering requirements. (Section 3.1.3)
a. Subflooring shall be in a smooth, true, level plane, except where indicated as sloped. b. Repair holes, cracks, depressions, or rough areas using material recommended by the floorcovering or adhesive manufacturer.
c. Any necessary preparation and compliance with industry standards and manufacturer recommendations shall be the responsibility of the contractor.
3. Contractor shall provide and install new carpet tiles in the identified areas. Samples will be provided so the customer can make selections. (Section 3.1.4) a. Installation of 892 sq.yds. carpet tiles w/adhesive in Magnolia Ballroom. Applicable Instructions:
Work areas may be occupied by the employees while work is being accomplished. Caution must be taken to ensure all safe work practices are adhered to. Caution shall be taken to prevent damage to the wall surfaces during removal process. All work shall be in accordance with applicable federal, state, and local regulations, specifications, commercial practices, manufacture specifications, and industry standards. Low VOC materials shall be used, and work areas shall be well ventilated. Contractor shall keep a clean work area daily. --End--
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: Statement of Work
- Attachment 10: JB CHS Approved Paint Colors
- Attachment 12: UFC Protective Coatings and Paints
- Attachment 13: USAF Carpet Ordering Guide
- Attachment 15: Sample Project Statement of Work (Protective Coating)
- Attachment 16: Sample Project Statement of Work (Misc Repairs)
- Attachment 19: Instructions to Offerors (Section L)
- Attachment 20: Evaluation Factors (Section M)
- Attachment 3: Orangeburg
- Attachment 4: Berkeley
- Attachment 5: Charleston
- Attachment 6: Dorchester