STATEMENT OF WORK

FOR
Design a Replacement ARSR4 Collector Power Supply Test Station (CPSTS) with functions similar to the current test station with CPS Interface, Test/Repair software and procedures to test the ARSR4 CPS and Preamp Power Supply (PPS) units to specification

CPSTS P/N: 18323ASSYKA422100G01, NSN NA

Revision A

REV

DESCRIPTION

DATE

ENTERED

BY

A

Initial SOW

31 JULY 2026

RJB

B

Updated TI 6340.26 to 6340.26
Chapter 46

9 Sept 2026

RJB

1.0 Overview

This Statement of Work (SOW) is issued by the Federal Aviation Administration (FAA), Radar Product Division, AJW-L900, for the design, development, fabrication, testing and delivery of a replacement Air Route Surveillance Radar (ARSR4) Collector Power Supply Power Supply Test Station (CPSTS) with similar features as outlined in Exhibit 6.1 that has the ability to test and repair the ARSR4 CPS and the ARSR4 PPS in according to the specifications listed below in Exhibit 6.2. This new CPSTS will replace the legacy system due to obsolescence, and repair capability issues with the current CPSTS. The new CPSTS is required to have similar mechanical design requirements and equivalent electrical performance or better using current generation components compared to the legacy system.
Reference Documents:
Exhibit 6.1 reference document “TI 6340.52: ARSR4 SYSTEM COLLECTOR

POWER SUPPLY TEST SET (CPSTS) MAINTENANCE MANUAL

Exhibit 6.2 reference document “TI 6340.59: ARSR4 SYSTEM UUTs

TESTED ON COLLECTOR/PREAMP POWER SUPPLY TEST SET

TI 6340.26 Chapter 46 ARSR4 Collector and Preamplifier Power Supply

Military Standards:
MIL-HDBK-217F-CHG 2Reliability Prediction of Electronic Equipment MIL-STD-721C Definition of Terms for Reliability and Maintainability

2.0 Contracting Officer’s Representative (COR)

The Contractor Officer’s Representative (COR) is formally designated with this responsibility by the Contracting Officer to provide direction and Government oversight to the Contractor on matters related to this contract.

3.0 Scope

The contractor shall furnish all labor, plant facilities, parts, supplies, materials, fixtures, equipment, tools, test equipment, technical data/expertise, and other facilities necessary to accomplish the design of a replacement CPSTS and test process and adapter in accordance with FAA’s manufacturing and test specifications, FAA Specifications (listed in Exhibit 6.1 and 6.2) and all other terms, conditions and provisions contained herein.
This SOW will cover all engineering costs, design costs, and the labor and