Attachment 0001

PERFORMANCE WORK

STATEMENT FOR

TOTAL ENGINEERING AND INTEGRATION SERVICES

(TEIS) IV FOR THE

UNITED STATES ARMY INFORMATION SYSTEMS ENGINEERING

COMMAND FORT HUACHUCA, AZ 85613-5300

March 26, 2026

Attachment 0001

1.0

2.0

2.1

2.2

2.3

2.4

2.5

2.6

3.0

3.1

3.2

3.3

3.4

3.5

3.6

3.7

3.8

3.9

3.10

3.11

3.12

3.13

3.14

3.15

3.16

3.17

3.18

4.0

4.1

4.2

4.3

4.4

4.5

4.6

4.7

5.0

6.0

7.0

8.0

Attachment 0001

9.0

10.0

11.0

Attachment 0001

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

1.0 SCOPE

The contract provides for information systems engineering and information technology support services to United States Army Information Systems Engineering Command (USAISEC). The services will include engineering related activities in support of all aspects of information and communication systems. Support will be required for the full life cycle of USAISEC projects to include planning, design, development, engineering, implementation, procurement, logistics, evaluation, test, sustainment, systems retirement, and ancillary services. Worldwide support is required. Most of the worldwide support is required to occur at sustained locations that are secure and possess adequate infrastructure. However, worldwide support may include areas with challenging environments including remote locations, and sometimes hostile locations with little to no infrastructure. Work in highly secure facilities involving the highest level clearances may be required. Specific tasks are further detailed in Section 3.0.

2.0 APPLICABLE DOCUMENTS

2.1 General

The following documents are incorporated by reference to and form a part of this Performance Work Statement (PWS). In the event of a conflict between the documents referenced herein and the contents of this contract, the contents of this contract shall control and be superseding. The Contractor is responsible for obtaining, and abiding by the most current and approved versions of all applicable references listed with webpage links below.
Other documents required for execution of tasks under this contract will be cited in the relevant task