Home / TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV… / Document

Attachment 7 2.5 item i UFC 4-140-03

Updated

A PDF document (756 KB) attached to TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV On-Ramp Opportunity, from the Department of the Army. Due Oct 30, 2026, 4:00 PM (UTC-6).

File name: ATT0007 2.5 item i UFC 4-140-03.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

DEPARTMENT OF THE ARMY

FACILITIES STANDARDIZATION

PROGRAM

COMMAND AND CONTROL

FACILITIES (C2F)

AND OTHER ARMY

HEADQUARTERS

STANDARD

DESIGN

UFC 4-140-03

20 July 2012

COMMAND AND CONTROL FACILITIES AND OTHER ARMY HEADQUARTERS

STANDARD DESIGN

PART I - GENERAL DESIGN REQUIREMENTS

1.0 GENERAL CRITERIA

1.1

Standardization
1.1.1
1.1.2

1.2

Core Requirements
1.2.1
1.2.2

1.3
1.4
1.5
1.6

Applicability
Previous Criteria / Background

Variability
Security Zones

Space Planning Criteria
Special Use Spaces
Audio Visual Equipment
Waivers

2.0 COMMAND AND CONTROL FACILITIES AND OTHER ARMY HEADQUARTERS

2.1
2.2
2.3
2.4

Function
Division Headquarters
Corps Headquarters
Army Service Component Command (ASCC)

2.4.1
Numbered Army (#A)
2.4.2
Other ASCC
2.5
Direct Reporting Units (DRUs)
2.6
Army Command (ACOM) Headquarters
2.7 Army HQ Internal Organization (and generally C2F)

2.8 Size And Space Allocation

2.9 C2F Site Plan

2.10 References

PART II - STATEMENT OF WORK

1.0 PROJECT OBJECTIVES

1.1

SECTION ORGANIZATION

2.0 SCOPE

2.1
2.2
2.3
2.4

[COMMAND AND CONTROL FACILITY][ARMY HEADQUARTERS]

SITE

GOVERNMENT-FURNISHED GOVERNMENT-INSTALLED EQUIPMENT (GFGI)

FURNITURE REQUIREMENTS

3.0 [DIVISION] [CORPS] [NUMBERED ARMY (#A)], [ARMY COMMAND (ACOM)] COMMAND &

CONTROL FACILITY

i
Revision 3.0 Dated 20 July 2012

3.1

GENERAL REQUIREMENTS

3.1.1
3.1.2
3.1.3
3.1.4
3.1.5

3.2

FUNCTIONAL AND OPERATIONAL REQUIREMENTS

3.2.1

3.3

Facility Description
Facility Relationships
Accessibility Requirements
Building Areas
Adapt Build Model

Functional Spaces

SITE FUNCTIONAL REQUIREMENTS

3.3.1

Site Design

3.4

SITE AND LANDSCAPE REQUIREMENTS

3.5

ARCHITECTURAL REQUIREMENTS

3.5.1

Finishes and Interior Specialties

3.6

STRUCTURAL REQUIREMENTS

3.7

THERMAL PERFORMANCE – NOT USED

3.8

PLUMBING REQUIREMENTS - OMITTED

3.9

COMMUNICATION AND SECURITY SYSTEMS

3.10 ELECTRICAL REQUIREMENTS

3.11 HEATING, VENTILATING AND AIR-CONDITIONING (HVAC)

3.11.1

Mechanical Design

3.12 ENERGY CONSERVATION REQUIREMENTS

3.13 FIRE PROTECTION REQUIREMENTS

3.13.1

Fire Protection and Life Safety

3.14 SUSTAINABLE DESIGN – NOT USED

3.15 ENVIRONMENTAL – NOT USED

3.16 PERMITS – NOT USED

3.17 DEMOLITION – NOT USED

3.18 ADDITIONAL FACILITIES – NOT USED

3.19 EQUIPMENT AND FURNITURE REQUIREMENTS

3.20 FACILITY SPECIFIC REFERENCES

ii

Revision 3.0 Dated 20 July 2012

3.21 GLOSSARY

ATTACHMENTS

ATTACHMENT A –

PROGRAMMING SUPPORT INFORMATION

ATTACHMENT B –

SPACE PROGRAM DEVELOPMENT

ATTACHMENT C –

DIVISION/CORPS PROGRAMMING REQUIREMENTS

ATTACHMENT D –

The beginning of the document. Download the full file to read on.

Other documents in this bid