Attachment 13 -Encino Lookout- 01
Updated
A PDF document (3.4 MB) attached to Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF, from the Forest Service. Due Nov 16, 2026, 2:00 PM (UTC-8).
File name: C05 Attachment 13 031001L010201-Encino Lookout-20250513-C-TSIR-V16_01.pdf
The full file is for paid members, or buy this bid alone.
Preview
STRUCTURE SUPPORT
BRANCH
FAA MMAC AJW-L523
TOWER INSPECTION
REPORT
Top Page: Site Information
Region/Forest
Forest Name
Facility Type
Facility Use
Site Name
Life Safety
Major
Overall Tower Condition
Site Coordinates Lat/Long
Access Road Starting Lat/Long
Inspection Team
Inspection Report Reviewed By
Date of Inspection
Date of Last Known Inspection
Obstruction Lighting
RF readings (safe/unsafe)
Tower Manufacture
Tower Model
Serial Number
Associated Drawing Numbers
Tower Height
Number of Sections
Tower Status/Current Use
Tower Type/System
Tower Leg and Brace Dimensions
Tower Cross Section/Face Width
Base/Section Bolt Size/Grade
Climbing Ladder/ Stairs
Dimensions
Weather Conditions
Site Information Notes
Site ID: 031001L010201
Santa Fe National Forest
Remote
Multi Use
Encino Lookout
Mission Capability
Major
Major
Environmental
Minor
36°7'21.17"N, 106°33'12.75"W
36°5'56.04"N, 106°32'5.36"W
Tanner Burnett, Devin Edwards
Scott Mosher
5/13/2025
Unknown
No
Safe
Aermotor
MC-39
Inspection Report Acceptance
Unknown
Name
Bradley Vaillancourt
N/A
Signature
59’ 6”
Elevation of Tower Slope Change
N/A
Status
Active
Current Use
LMR
Type
Self Supported
System
Lookout
Leg
L4”x4”
Brace
L2.4”x2.5”
Cross Section Square
Face Width
190”
Base
2x0.87”
Section
4x0.75
Ladder Width 24”
Rung to Rung
9”
Rung Type
Step/Wood
Rung Size
9”x1.5”
Temperature
51.3 °F
Humidity
42.5 %
Wind Speed
31.2 mph
Skies
Clear
Yale key gate.
v.16
Sign Here
Executive Summary
ENGINEER NOTES AND RECOMMENDATIONS LISTED BELOW PER THE
Are there deficiencies that would
YES INFORMATION PROVIDED IN THE SITE REPORT:
impact a structural analysis?
During the course of the tower’s conditional assessment the Federal Aviation Administration (FAA) field team has found no reasonably identifiable deficiencies that could impact the tower load rating provided by the structural analysis. The tower overall conditional assessment rating is Major (no recommended site access restrictions). Each recorded deficiency has been detailed in the appropriate section of this report. It is recommended that each deficiency should be addressed to prevent future impact to the tower’s structure integrity, life safety, and mission capability.
Reference: Life safety compliance, mission capability, and environmental.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Attachment 1: Statement of Work
- Attachment 3: Specifications
- Attachment 4: Fire Plan and Guidelines
- Attachment 5: Wage Determination
- Attachment 6: Wage Determination
- Amendment 1: Provisions and Clauses
- Amendment 1
- Bid document
- Attachment 11: Encino LO Structural Data
- Attachment 12: Region 3-0310 Santa Fe National Forest - Encino LO
- Attachment 14 -Encino Lookout- -Data V1.1