Attachment 2: Specifications
Updated
A PDF document (8.9 MB) attached to 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming, from the Forest Service. Due Nov 17, 2026, 3:00 PM (UTC-7).
File name: C04b Attachment 2 Specifications 1240LT26Q0109.pdf
The full file is for paid members, or buy this bid alone.
Preview
United States Department of Agriculture
Forest Service
WYOMING
SWEETWATER COUNTY
FLAMING GORGE NATIONAL RECREATION AREA
ASHLEY NATIONAL FOREST
FLAMING GORGE RANGER DISTRICT
Specifications
for
Buckboard Marina Water System
Improvements
Buckboard Marina – FR 009, MCKINNON, WY 82938
February, 2026
Horrocks PN UT-10875-25
4246 S. Riverboat Rd, Ste 200, Salt Lake City, UT 84123
US Forest Service –
Buckboard Marina Water System Improvements
February, 2026
Project Location:
FR 009, McKinnon, WY 82938
TECHNICAL SPECIFICATIONS
INTRODUCTORY INFORMATION
00 00 01
Title Page
00 00 30
DIVISION 1
GENERAL REQUIREMENTS
01 02 50
Measurement and Payment
01 41 26
Permit Requirements
DIVISION 2
EXISTING CONDITIONS
02 21 15
Construction Staking
02 41 00
Site Preparation and Selective Demolition
DIVISION 03
CONCRETE
03 10 00
03 41 43
Cast-In-Place Concrete
Pre-Cast Concrete Utility Building
03 61 00
Cementitious Grouting
05 05 10
Metal Galvanizing
05 05 23
Anchor Bolts
05 05 24
Bolts, Nuts, and Accessories
05 51 00
Metal Fabrications
DIVISION 07
THERMAL AND MOISTURE PROTECTION
07 21 00
Insulation
DIVISION 08
OPENINGS
08 11 10
Standard Steel Door
08 71 00
Door Hardware
DIVISION 09
FINISHES
09 90 00
Coatings and Finishes
09 91 00
Painting
DIVISION 22
PLUMBING
22 11 03
Water Treatment System Rehabilitation
22 11 13
Facility Butterfly Valves
22 11 23
Submersible Pump and Appurtenances
22 11 25
Water Pump
23 05 00
General Mechanical Requirements
23 37 14
Louvers and Vents
23 82 29
Unit Heaters
26 05 00
Electrical General Requirements
26 05 19
Low-Voltage Electrical Power Conductors and Cables
26 05 26
Grounding and Bonding for Electrical Systems
26 05 29
Hangers and Supports for Electrical Systems
26 05 33
Raceway and Boxes
26 05 43
Underground Ducts and Raceways for Electrical Systems
26 05 53
Identification for Electrical Systems
26 08 00
Commissioning of Electrical Systems
DIVISION 05
METALS
DIVISION 23
HVAC
DIVISION 26
ELECTRICAL
DIVISION 31
EARTHWORK
DIVISION 32
EXTERIOR IMPROVEMENTS
DIVISION 33
UTILITIES
26 22 13
Low-Voltage General Purpose Transformers
26 24 16
Panelboards
26 24 19
Motor Control Centers
26 27 16
Electrical Cabinets and Enclosures
26 27 26
Wiring Devices
26 28 16
Enclosed Switches and Circuit Breakers
26 29 23
Variable Frequency Drives
26 36 23
Automatic Transfer Switches
26 50 00
Lighting
31 22 00
Grading
31 23 00
Excavation, Backfilling, and Compaction
31 25 00
Erosion Control
32 05 00
Restoration of Existing Improvements
32 11 23
Base Course
32 12 16
Asphaltic Concrete Paving
33 05 19
Ductile Iron Utility Pipe
33 05 30
Utility Locating System
33 11 00
Water Distribution and Transmission
The beginning of the document. Download the full file to read on.