US Forest Service

Horrocks PN UT-10875-25

Buckboard Marina Water System Improvements

February, 2026

SECTION 01 02 50

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1

SECTION INCLUDES

A. Measurement and payment criteria applicable to portions of the Work performed under a unit price payment method.

1.2

RELATED SPECIFICATIONS – NOT USED

1.3

MEASUREMENT OF QUANTITIES

A. Measurement Devices:

1.4

1.

Weigh Scales: Inspected, tested and certified by the applicable state Weights and Measures department within the past year.

2.

Platform Scales: Of sufficient size and capacity to accommodate the conveying vehicle.

3.

Metering Devices: Inspected, tested and certified by the applicable State department within the past year.

PAYMENT

A. Payment for each Bid item includes full compensation for all required labor, materials, products, tools, equipment, manufacturing, transportation, services and incidentals; application or installation; permits, taxes, royalties, import costs, overhead and profit.

1.5

DESCRIPTION OF BID ITEMS

A. The work generally consists of the following, which are numbered according to the Bid schedule:
B.

Base Bid – New Raw Water Intake and Irrigation
1.

Mobilization – Measurement is by lump sum. Payment includes mobilization, demobilization, installation of temporary facilities, construction fencing, all bonds, insurances, permits and fees, traffic control, public outreach, coordination, erosion control, SWPPP and implementation of erosion control, quality control and testing of materials, preparation of project schedule, project identification sign, construction survey and layout, final cleanup and project closeout, and all other items not specifically called for in any other Bid item or called for in the Drawings and Specifications or is customary, incidental or appurtenant to performance of a complete project. Payments shall be made on according to the schedule established in Paragraph G.1 herein.

2.

SWPPP (Erosion Control) – Measurement is by lump sum. Payment includes all labor, materials, incidental costs, material placement, silt fencing, and permitting costs as required to produce, permit, and implement the Stormwater Pollution Prevention Plan as indicated in the drawings.

3.

Clear and Grub – Measurement is by acre. Payment includes clearing, grubbing, and removal of all vegetation, trees, brush, roots, stumps, organic matter, and other objectionable materials within the limits shown on the Drawings or as directed by the Engineer.

4.

Construction Staking – Measurement is by lump sum. Payment includes all labor,

The beginning of the document. Download the full file to read on.