USDA FOREST SERVICE, R-4
BUCKBOARD MARINA WATER SYSTEM IMPROVEMENTS
SECTION 01 00 10 – STATEMENT OF WORK AND GENERAL CONDITIONS
GENERAL
SCOPE OF CONTRACT
This project is for reconstruction of the raw water intake and various portions of the Buckboard Marina public water system at the Flaming Gorge National Recreation Area. The base work, New Raw Water Intake and Irrigation, includes: Directional drilling of a new intake casing pipe into the reservoir, Installation and removal of a cofferdam to construct the intake below water level, Installation of new submersible pump and intake pipe within the intake casing Installation of a new intake pumphouse with booster pump and associated controls and plumbing infrastructure, New raw water pipeline to the existing water treatment plant, including associated valves, drains, and combination air valve, New raw water storage tank and in-line pump to the water treatment plant, New irrigation booster pump and pipeline to connection to existing irrigation system, New overhead power supply to the intake pumphouse,
New native-surface access road to the intake pumphouse, New SCADA system for pump operations, and
Design/build of the electrical and communications systems. Optional work that may be awarded includes all work described above associated with: Option #1 – Underground Storage Tanks:
Installation of 5 underground finish water storage tanks, New in-line booster pump to distribution system, and
Associated drainage and domestic water piping, valve, and drains. Option #2 – Looped Water Distribution System:
Replacement of a portion of the water distribution including associated valves, drains, and service connections, Installation of combination air release valves,
Installation of fire hydrant, and
Asphalt pavement repairs.
Option #3 – Water Meters:
Installation of water meters and boxes at various points on the distributions system or at service connections. Option #4 – Upgrade Treatment Plant:
Removal and disposal of an existing 20 GPM package water treatment plant within an existing CMU building to remain, Design and construction of a new 40 GPM package water treatment plant within an existing CMU building, and Installation of associated plumbing, electrical, and SCADA for a complete operational unit. Option #5 – Waterline Extension to Future Dock Location: Installation of new waterline including associated valves and drains. Quantities associated with these options are identified in the Schedule of Items.