Options Supplement
Updated
A PDF document (961 KB) attached to 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming, from the Forest Service. Due Nov 17, 2026, 3:00 PM (UTC-7).
File name: C04g Options Supplement 1240LT26Q0109 102026.pdf
The full file is for paid members, or buy this bid alone.
Preview
o
N
OPTION 1: INCLUDES FIVE FINISH WATER TANKS "C" AND ASSOCIATED DRAINS, VALVES, AND BOOSTER PUMP TO DISTRIBUTION SYSTEM.
250'
OPTION 3: INCLUDES WATER METERS INSTALLED AT SERVICES AND MAINLINE POINTS "E" AS SHOWN ON THE PLANS.
OPTION 4: INCLUDES DESIGN-BUILD OF THE WATER TREATMENT PLANT TO UPGRADE CAPACITY TO 40 GPM. WORK WILL INCLUDE ASSOCIATED ELECTRICAL AND COMMUNICATIONS DESIGN ABOVE THE BASE BID DESIGN WORK ITEM.
P
FR 0
FR
A
BEGINNING OF BASE BID WORK AT RAW WATER CONNECTION TO
TREATMENT PLANT.
B
END OF BASE BID WORK AT INTAKE INLET.
C
BID OPTION 1 WORK TO INCLUDE FINISHED WATER TANKS AND
ASSOCIATED PIPING FROM TREATMENT PLANT TO EXISTING
DISTRIBUTION SYSTEM CONNECTIONS
D
BID OPTION 2 WORK INCLUDES NEW DISTRIBUTION LOOPS WITH
CONNECTIONS TO EXISTING SERVICES.
E
BID OPTION 3 WORK INCLUDES WATER METERS AT 5 LOCATIONS.
F
BID OPTION 4 WORK INCLUDES PACKAGE TREATMENT PLANT
REPLACEMENT WITHIN AN EXISTING BUILDING.
500'
SCALE: 1" = 500'
OPTION 2: INCLUDES DISTRIBUTION SYSTEM "D" IN A "FIGURE 8" PATTERN TO AND INCLUDING THE AIR-VAC VALVE AT "G". ALSO INCLUDES ALL ASSOCIATED VALVES AND SERVICE TIE-INS.
FR 054
KEYNOTES
s
BASE BID: INCLUDES RAW WATER LINE FROM TREATMENT PLANT CONNECTION "A" TO INTAKE "B" AND ASSOCIATED PARALLEL ACCESS ROAD, COMMUNICATION LINE, AND POWER LINES. ALSO INCLUDES INTAKE INFRASTRUCTURE, RAW WATER TANK INFRASTRUCTURE, AND PUMPS TO TREATMENT PLANT AND IRRIGATION SYSTEM. ELECTRICAL PLANS FOR FULL BUILD-OUT (EXCEPT OPTION 4 TREATMENT PLANT) SHALL BE PREPARED.
M
r r o c k
H
GENERAL WORK OPTIONS OVERVIEW
OPTION 5: INCLUDES DISTRIBUTION SYSTEM EXTENSION FOR FUTURE BOAT DOCKS FROM THE OPTION 2 WORK AT "G" TO THE STUB AND DRAIN AT "H", INCLUDING ASSOCIATED VALVES AND DRAINS.
G
BEGINNING OF BID OPTION 5 AT CONNECTION TO BID OPTION 2
DISTRIBUTION SYSTEM.
H
END OF BID OPTION 5 AT FUTURE STUBOUT AND DRAIN.
United States Department of Agriculture
Forest Service
R4
FLAMING GORGE RECREATION AREA
STAMPS, LOGOS, AND SEALS
SHEET NOTES
P
1.
THE ENGINEER HAS MADE AN EXTENSIVE EFFORT TO LOCATE ALL EXISTING
UTILITY LINES FROM RECORDS PROVIDED BY OTHERS AND EVIDENCE IN THE
FIELD. CONTRACTOR TO VERIFY ALL EXISTING UTILITY LOCATIONS PRIOR TO
COMMENCING WORK.
2.
BASE BID AND OPTIONAL WORK AS DESCRIBED ON THIS SHEET ARE FOR
GENERAL INFORMATION ONLY. SEE THE SCHEDULE OF ITEMS FOR SPECIFIC
INFORMATION ON WHAT IS INCLUDED IN THE BASE OR BID OPTIONS. SEE
THE PLANS AND SPECIFICATIONS FOR MORE INFORMATION ON WHAT IS
INCLUDED IN EACH BID ITEM UNIT OF WORK.
The beginning of the document. Download the full file to read on.