PROJECT SPECIFICATIONS
For
Project PBXP272019
B300 BDOC Renovation
At
179 CYBERSPACE WING
OHIO AIR NATIONAL GUARD
1947 HARRINGTON MEMORIAL ROAD
MANSFIELD LAHM AIRPORT, OHIO
PBXP272019
DIVISION 01
GENERAL REQUIREMENTS
SECTION 01 11 00
SUMMARY
PART 1 GENERAL
1.1 Work Covered by Contract Documents
1.2 Work Restrictions
1.3 Occupancy of Premises
1.4 Existing Work
1.5 Government Furnished Equipment and Materials
1.6 Submittals
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
SECTION 01 20 00
PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 Product Substitution Procedures
1.2 Submittals
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 Project Management and Coordination
1.2 Submittals
1.3 Construction Progress Documentation
1.4 Survey and Layout Data
1.5 Construction Progress Reporting
1.6 Submittal Procedures
1.7 Special Procedures
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
SECTION
01 33 00
SUPPLEMENTAL SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 Definitions
1.2 Submittals
1.3 Submittal Classification
1.4 Preparation
1.5 Quantity of Submittals
1.6 Information Only Submittals
1.7 Product Submittal Register
1.8 Variations
1.9 Scheduling
1.10 Government Approving Authority
1.11 Disapproved Submittals
1.12 Approved Submittals
1.13 Approved Samples
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
SECTION 01 40 00
QUALITY REQUIREMENTS
PART 1 GENERAL
1.1 Abbreviations and Acronyms
PBXP272019
PART 2
PART 3
1.2 Reference Standards
1.3 Submittals
1.4 Quality Assurance
1.5 Quality Control
1.6 Testing and Inspecting Services
1.7 Testing Laboratory Services
PRODUCTS (NOT USED)
EXECUTION (NOT USED)
SECTION 01 60 00
PRODUCT REQUIREMENTS
PART 1 GENERAL
1.1 Submittals
1.2 Common Product Requirements
1.3 Product Options
1.4 Product Delivery Requirements
1.5 Product Storage and Handling Requirements
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
SECTION 01 70 00
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 1 GENERAL
1.1 Submittals
1.2 Examination and Preparation
1.3 Field Engineering
1.4 Cleaning and Waste Management
1.5 Site Maintenance
1.6 Final Cleaning
1.7 Starting and Adjusting
1.8 Closeout Procedures
1.9 Closeout Submittals
1.10 Extra Stock Materials
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
SECTION 1 74 19
CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
PART 1 GENERAL
1.1 Related Documents
1.2 References
1.3 Definitions
1.4 Submittals
1.5 Construction Waste Management
1.6 Meetings
1.7 Oversight
1.8 Records
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.2 Construction Waste
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1a B422 Breakroom Statement of Work
- Attachment 1b B422 Breakroom Drawings
- Attachment 2a B300 BDOC Statement of Work
- Attachment 2b B300 BDOC Drawings
- Exhibit A Sealed Bid Checklist Reminders
- Exhibit B Checklist for Bid Bonds
- Breakroom and B300 BDOC
- Contractor Access form
- 0001 Amendment 1 (conformed copy)
- 0001 Amendment 1
- Attachment 1c B422 Breakroom Specifications
- Request for Information and Response document (as of)