Home / Tri-Base Area Construction Basic Ordering Agreement / Document

Attachment 3: RAF Mildenhall Base Standards

Updated

A PDF document (8.7 MB) attached to Tri-Base Area Construction Basic Ordering Agreement, from the Department of the Air Force. Due Apr 27, 2029, 2:00 PM (UTC+1).

File name: Attachment 3 RAF Mildenhall Base Standards Sep2022.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

BOA Number: FA558724G0001
Attachment 3

BASE STANDARDS

RAF MILDENHALL

UNITED KINGDOM

SEPTEMBER 2022

PAGE: 2 // 4 8

BOA Number: FA558724G0001
Attachment 3

Welcome

1.0

1.0

2.0

3.0

4.0

5.0

6.0

7.0

8.0

9.0

10.0

PAGE: 3 // 4 8

BOA Number: FA558724G0001
Attachment 3

INTRODUCTION

1.3 INTRODUCTION

This describes what the Base Standards are, what they do, how and where they will be used, how they will be made available and revision procedures. Facility Managers and Technical Contributors are listed.

1.3.0 Change Management

1.3.0.1 Change Program

Standards will be distributed for comments, adjusted, reviewed and re-issued according to the following schedule.
Request updates from Commanders/Facility Managers/Contributors 1 Apr Comments Deadline 1 Jun
Update Deadline 1 Jul
Brief BCE/CE/DIO etc. on new document 1 Aug
Final adjustments/ BCE Approval 14 Aug
Load up prior to release 1 Sept
Formal Issue to DE, Contractors etc. 1 Oct

1.3.0.2 Change management

The document is intended to be flexible, to accommodate new procedures, materials and equipment. New sections will be identified as new at the front page. ‘Document Headers’ identify last revision dates. Revisions will be reviewed as far as possible by the BCE, DIO, and contributors prior to issue.

1.3.1 Definition

Base Standards establish technical and aesthetic standards for the built fabric and technical installations, and working practices for A/Es and Contractors working on base. Specifications ensure technical compatibility, visual continuity, ease of maintenance, adequate services engineering, fire protection and security. Control over materials and design is also exercised by the most stringent of US Forces Regulations (such as ETLs and UFCs), and UK Building Regulations etc. Some Regulations and other sources of information are provided at Section 1.4 ‘References’, but is not exhaustive. Note that as this is a living document it will change.

PAGE: 5 // 4 8

BOA Number: FA558724G0001
Attachment 3

‘Contractor and A/E Responsibilities’ define procedures to access the Base (passes etc.), requirements to execute work (‘Siting Approval’ and ‘Permission to Dig’) and Format Standards for ‘As Built’ documents. ‘Site Management’ includes signage to be installed on compound enclosures. ‘Architectural’ items describe materials and colors including external windows, bollards, fences, paving, parking, benches and gazebos. Internal finishes include kitchen units, locks and ironmongery, sanitary ware, signage and blinds. ‘Landscaping’ provides guidance on ground reinstatement and a

The beginning of the document. Download the full file to read on.

Other documents in this bid