DEPARTMENT OF THE AIR FORCE
75TH CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
ASBESTOS
LEAD BASED PAINT
LIMITED INSPECTION REPORT
INSPECTION DATE: 04 August 2026
(This inspection is valid for three years from the inspection date regardless of Exp. Date of inspector cert. If past this date, a visual or additional assessment will then be required)
Reference UDAQ R307-807-6
Utah Certified State Inspector: Kyle Daly
(ASB#-7321: Expires-18 Aug. 2026, PB#-2753: Expires-29 Oct 2028)
REMOVE STEAM LINES IN EAST MECHANICAL ROOMS
WORK TASK/CAPITAL PROJECT #: 18773888
FACILITY: 1515
FACILITY CONSTRUCTION DATE: 1988
REQUESTER: BRIAN BAILEY
ORGANIZATION: 309 SWEG
REQUESTED: 07 July 2026
THE QUANTITIES WITHIN THIS REPORT ARE ESTIMATES AND SHOULD
NOT BE USED FOR BIDDING PURPOSES
PREPARED BY: Kyle Daly (ASB#-7321, PB#-2753)
DALY.JOHN.KYLE.15 Digitally signed by
DALY.JOHN.KYLE.1590487178
Date: 2026.08.10 07:53:17 -06'00'
SIGNATURE: 90487178
DEPARTMENT OF THE AIR FORCE
75 CIVIL ENGINEERING (CEOHA)
HILL AIR FORCE BASE, UTAH
LIMITED ASBESTOS INSPECTION REPORT INFORMATION
Statement of Work: Remove steam lines in east mechanical rooms. This inspection was performed in accordance with the Utah Division of Air Quality (DAQ) requirements as found in the Utah Air Quality Rule R307-801-10. This inspection report is required to be on site during all abatement, renovation, and demolition activities. Samples referenced in this report were analyzed by polarized light microscopy (PLM) utilizing method 600R-93-116 by Dixon Information (AIHA Acc.#-101579, NVLAP Lab Code 101012-0) at 78 West 2400 South SLC, Utah 84155 Utah (R307-801-10.8.a-b). Civil Engineering personnel also reviewed previous asbestos inspection reports of suspect asbestos containing materials (ACM) that could potentially be encountered in the proposed area/areas. The information gathered from all current and previous inspections is shown below by homogenous area (R307-801-9-4).
The quantities within this report are estimates and are not to be used for bidding purposes.
SUMMARY OF ASBESTOS CONTAINING MATERIALS FOUND
MATERIAL TYPE
N/A
ASBESTOS FRIABILITY
N/A
N/A
*RACM
*Category I
*Category II
QUANTITY
*LOCATIONS FOUND
N/A
N/A
N/A
Table 1
*Per UDAQ definition.
RACM: Regulated Asbestos-Containing Material (RACM)" means friable ACM, Category I non-friable ACM that has become friable, Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or Category II non-friable ACM that has a high probability of becoming or has become crumbled,