Home / 16292 Steam Boiler Replacement / Document

Hill AFB IFS Electrical

Updated

A PDF document (400 KB) attached to 16292 Steam Boiler Replacement, from the Department of the Air Force. Due Oct 30, 2026, 12:00 PM (UTC-6).

File name: G14_Hill_AFB_IFS_Electrical.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Hill Air Force Base
Installation Facilities Standards (IFS)
G014 AFB IFS Electrical
Comply with Air Force Corporate Standards for Overview: http://afcfs.wbdg.org/index.html
Summary of Sections in this Supplementary Document:
G14.0. General Requirements
G14.1. General Design Criteria
G14.2. Hill AFB Exterior Distribution
G14.3. Hill AFB Interior Distribution
G14.4. Exterior Lighting
G14.5. Interior Lighting
G14.6. Permitted Lighting Technology
G14.7. Additional Lighting Guidelines

G14.8. TEMPEST

G14.9. Special Protection for Rotating Electrical Equipment: G14.10. Lightning, Static & Surge Protection
G14.11. Generators
G14.12. ACS Systems
G14.13. Intrusion Detection Systems (IDS)
G14.14. Cybersecurity Compliance of Facility Related to Control Systems G14.0 General Requirements
14.0.1 Note: This Supplementary Document is provided as part of the Hill AFB IFS and will become fully part of the IFS. If there are any discrepancies between this Supplementary Document and the requirements of the IFS, the IFS will govern. 14.0.2 This Supplementary Document supersedes the Hill Air Force Base Architectural Compatibility Guide dated 01 February 2019.
G14.1 General Design Criteria
14.1.1 Applicable Design Criteria: All installations must comply with the following criteria as applicable including but not limited to UFC 3-501-01, Electrical Engineering which provides minimum requirements for design analyses and calculations, UFC 3-550-01 Exterior Electrical Power Distribution which provides minimum requirements for underground distribution system design (AF ETL 11-10:
Electrical Manhole Design Considerations clarifies these requirements and provides additional recommendations), NFPA 70 National Electric Code (NEC), NFPA 70E Standard for Electrical Safety in the Work Place, the Lineman’s and Cableman’s Handbook, AFMAN 32-1065 Grounding and Electrical Systems, City Light & Power (CLP) Electric Service Connection Standards Manual. Note that CLP specifications take precedence over UFC requirements. UFC 3-550-01 Section 1-6 states, “This UFC does not apply to … Military installations that have privatized their electrical distribution system.”

Electrical distribution segments/appurtenances which will become ownership of the system owner, CLP, will comply with their service connection manual, available from CLP. (See URL https://clp.exavault.com/share/view/m6nc-eyf62h1y using access code: CLPscp101!). 14.1.2 Coordination Requirements: Prior to the installation or modification of any existing

The beginning of the document. Download the full file to read on.

Other documents in this bid