Home / KAUTZ Road Substation Construcion, UIP Subproject 2- KRS / Document

Exhibit H- Price Proposal Form

Updated

A PDF document (469 KB) attached to KAUTZ Road Substation Construcion, UIP Subproject 2- KRS, from the Department of Energy. Due Dec 18, 2026, 4:00 PM (UTC-6).

File name: Exhibit H- Price Proposal Form.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

REFERENCE

EXHIBIT H

REQUEST FOR PROPOSAL NO.

REQUEST FOR PROPOSAL

FERMI FORWARD DISCOVERY

GROUP, LLC

TO:

383167-CD

DATE

November 2, 2026

Fermi National Accelerator Laboratory
P. O. Box 500 – Mail Station 210
Batavia, Illinois 60510-0500

(Date of Offer)

Please enter your total firm fixed price in words and numbers:

)Firm Fixed Price

(Dollars)($

NAME OF PROJECT & LOCATION

Kautz Road Substation Construction, UIP Subproject 2 KRS. The project is located on the Fermi National Accelerator Laboratory (Fermilab) Site, adjacent to the city of Batavia, Illinois, in DuPage County.

This Offer may be accepted for a period of One Hundred Twenty (120) calendar days after the opening date unless the offeror specifies a longer acceptance period than FFDG’s minimum requirement. The Subcontractor Annual Representations & Certifications (SARC) is made a part of this subcontract.

ENCLOSED IS BID GUARANTEE, CONSISTING OF:

NAME OF BIDDER (Type or Print)

IN THE AMOUNT OF

FULL NAME OF ALL PARTNERS (Type or Print)

BUSINESS ADDRESS (Type or Print) Include Zip Code
EMPLOYER I.D. NO.
BY (Signature in ink)(Print or Type Name)
TITLE (Print or Type)

REQUEST FOR PROPOSAL NO:

TITLE OF PROJECT:

DUE DATE AND TIME:

SUBMITTAL LOCATION:

383167-CD
Kautz Road Substation Construction, UIP Subproject
2- KRS
December 18, 2026, 4:00 p.m./Central Time
All proposal to be sent electronically to
[email protected]

THE OFFEROR SHALL SUBMIT THIS COMPLETED FORM WITH THEIR WRITTEN PROPOSAL

PRICING/EVALUATION PAGE

Kautz Road Substation Construction, UIP Subproject 2- KRS 383167-CD
The scope of work consists of all labor, materials, transportation, overhead, bonding costs, safety oversight, quality control oversight, supervision, and equipment necessary as required to perform the Scope of Work for Kautz Road Substation Construction. All work in accordance with the attached solicitation documents.

PRICING:

BASE Bid: Firm Fixed Price

MEASUREMENT AND PAYMENT

1.01

1.02

SCOPE

A.

The scope of this section of the Contract Documents is to further define the items included in each Bid Item in the Bid Form section of the Contract Documents. Payment will be made based on the specified items included in the description in this section for each bid item.

B.

All contract prices included in the Bid Form section will be full compensation for all shop drawings, working drawings, labor, materials, tools, equipment, and incidentals necessary to complete the construction as shown on the Drawings and/or as specified in the Contract Documents to be performed

The beginning of the document. Download the full file to read on.

Other documents in this bid