Fire Barrier INSP Form
Updated
A PDF document (525 KB) attached to No Award Amendment| WNY Chute, Barrier, & Door Inspections, from the Department of Veterans Affairs. Due Nov 12, 2026, 3:00 PM (UTC-5).
File name: Fire Barrier INSP Form.pdf
The full file is for paid members, or buy this bid alone.
Preview
FIRE BARRIER INSPECTION FORM
FACILITY:
FLOOR:
INSPECTOR:
DATE:
BUILDING:
LOCATION/STAIRWELL:
SIGNATURE:
BARRIER COMPLIANT
REPAIRED
⃝ YES
⃝ YES
⃝ NO
⃝ NO
(IF NOT COMPLIANT FILL OUT DESCRIPTION ON BACK)
FREFFIRE BARRIER INSPECTION CHECKLIST
PASS
FAIL
N/A
⃝
⃝
⃝
Visual confirmation that fire barrier is present.
⃝
⃝
⃝
Adjoining rooms have visible fire barrier.
⃝
⃝
⃝
Identified fire barrier has no PRIMARY penetrations.
⃝
⃝
⃝
Adjoining room(s) has no PRIMARY penetrations
ID:
⃝
⃝
⃝
Identified fire barrier has no SECONDARY penetrations.
⃝
⃝
⃝
Adjoining room(s) has no SECONDARY penetrations
NOTE:
Hard Ceilings with access panels, allow visible confirmation, may limit capability of making repairs.
Primary Penetrations: Holes, Cracks, or Chipping that
prevents the Fire Barrier from being 100% complete.
Secondary Penetrations: Utility stub outs that are not
capped off.
ID:
FIRE BARRIER/DOOR PM’S INSPECTION NOTES
DESCRIPTION OF FAILURES:
REPAIRS MADE:
DATE REPAIRS WERE COMPLETED:
REPAIRS COMPLETED BY:
ONCE COMPLETED
ALL INSPECTION FORMS MUST BE
RETURNED TO
CARPENTER SHOP SUPERVISOR
FOR VERIFICATION AND UPLOAD
The beginning of the document. Download the full file to read on.