Smoke Barrier INSP Form
Updated
A PDF document (510 KB) attached to No Award Amendment| WNY Chute, Barrier, & Door Inspections, from the Department of Veterans Affairs. Due Nov 12, 2026, 3:00 PM (UTC-5).
File name: Smoke Barrier INSP Form.pdf
The full file is for paid members, or buy this bid alone.
Preview
SMOKE BARRIER/DOOR PM’S INSPECTION FORM
FACILITY:
FLOOR:
INSPECTOR:
DATE:
BUILDING:
LOCATION:
SIGNATURE:
COMPLIANT
⃝ YES
⃝ NO
(IF NOT COMPLIANT FILL OUT DESCRIPSTION)
SMOKE BARRIER INSPECTION CHECKLIST
PASS
FAIL
N/A
⃝
⃝
⃝
⃝
⃝
⃝
Visual confirmation that smoke barrier is present.
NOTE:
Adjoining rooms have visible fire barrier.
100% indicates that ONE side of Smoke Barrier is
completely intact with no penetrations
Adjoining room(s) ID
⃝
⃝
⃝
Wing entrances may contain cable tray used for data,
and electrical lines. If this is applicable to the inspected smoke barrier, ensure fire rated pillow is used to
completed smoke barrier.
Identified smoke barrier meets 100% completion
(No through penetration)
SMOKE DOOR INSPECTION CHECKLIST
PASS
FAIL
N/A
⃝
⃝
⃝
Door Present
⃝
⃝
⃝
Door resist passage of smoke
⃝
⃝
⃝
(Gaps are less than ¾” undercut and less than ¼” at jambs and header)
⃝
⃝
⃝
Door lite is has no damage
Door closes properly
DESCRIPTION OF FAILURES:
Repairs Made:
DATE REPAIRS WERE COMPLETED:
REPAIRS COMPLETED BY:
ONCE COMPLETED
ALL INSPECTION FORMS MUST BE RETURNED TO
CARPENTER SHOP SUPERVISOR
FOR VERIFICATION AND UPLOAD
The beginning of the document. Download the full file to read on.