Home / Flight Test, Telemetry and Termination (FT3) Flight Test… / Document

FT3 Performance Work Statement Production Follow-On

Updated

A PDF document (399 KB) attached to Flight Test, Telemetry and Termination (FT3) Flight Test Kit Production, from the Department of the Air Force. Due May 17, 2027, 5:00 PM (UTC-6).

File name: 1. FT3 PWS_Production Follow-On Final_17 Nov 26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

FT3 Production Follow-On Performance Work Statement – 17 November 2026

PERFORMANCE WORK STATEMENT

for

FLIGHT TEST, TELEMETRY, AND

TERMINATION (FT3) PROGRAM

OPERATIONS AND SUPPORT PHASE

FT3 Production Follow-On

17 November 2026

AIR FORCE NUCLEAR WEAPONS CENTER (AFNWC)

INTERCONTINENTAL BALLISTIC MISSILE (ICBMSD)

SYSTEMS DIRECTORATE (AFNWC/NI)

MMIII Systems Program Office (AFNWC/NIM)
Guidance Branch (AFNWC/NIMG)
Hill Air Force Base, Utah

Distribution Statement A:
Distribution authorized to Department of War and U.S. DoD contractors only (public release), 8 April 26. Other requests must be referred to MMIII SPO (AFNWC/NIM), 6014 Dogwood Ave, Hill AFB UT 84056.

FT3 Production Follow-On Performance Work Statement – 17 November 2026

1.1
1.2
1.3

2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5
2.1.6
2.1.7
2.1.8
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13

FT3 Production Follow-On Performance Work Statement – 17 November 2026

SECTION I. DESCRIPTION OF SERVICES/SCOPE

1.1 Introduction

The flight test kit consists of the Flight Destruct System (FDS) and an Integrated Instrumentation System (IIS), and is expected to meet Space Launch Delta (SLD) 30 Range Safety and Air Force Global Strike Command (AFGSC) requirements and resolve obsolescence concerns. Flight test kit replenishment spares are necessary to sustain future Operational Test Launches (OTL). The OTLs are critical to validating the continued accuracy and reliability of the Minuteman (MM) III Intercontinental Ballistic Missile (ICBM) Weapons System and providing valuable data to ensure a safe, secure, and effective nuclear deterrent. The FT3 flight test kit is expected to perform the same function as the existing flight test kits and comply with Range Commanders Council (RCC) 319, Flight Termination Systems Commonality Standard, and RCC-324, Global Positioning and Inertial Measurements Range Safety Tracking Systems’ Commonality Standard as tailored for the FT3 Program.

1.2 Description of Services

The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to produce flight test kits to include flight spares to support OTLs except for those items specified in the FT3 Government Furnished Property (GFP) Listing as defined in this Performance Work Statement (PWS). The contractor shall perform to the standards in this contract.

1.3 Scope and Period of Performance

The beginning of the document. Download the full file to read on.

Other documents in this bid