FY27 SBIWTP OM Performance Work Statement REV 1
Updated
A PDF document (469 KB) attached to Operations and Maintenance (O&M) Services for the SBIWTP, from the International Boundary and Water Commission: Us-mexico. Due Jan 6, 2027, 2:00 PM (UTC-7).
File name: FY27 SBIWTP OM PWS REV 1 10.19.26.pdf
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE
WORK
STATEMENT (PWS)
SBIWTP
OPERATION AND MAINTENANCE (O&M)
USIBWC
23 September 2026
Section
Title
Page
A
Description of Services
1.0
1.1
1.2
1.2.1
1.2.3
1.2.4
1.3
1.5
Background
Scope of Work
Operations
Operations of SBIWTP
Operations of Canyon Collectors
Operations of SCADA
Monitoring and Reporting Requirements
Maintenance and Repair
B
Laboratory & Regulatory Agency Coordination
C
Government Furnished Property (GFP)
and Services
3.1
3.2
Utilities
Joint Inventory
D
Program Management
4.2
4.5
4.6
4.7
4.8
Key Staff
Quality Management
Security Requirements
Safety
Contractor Support
Appendix A
Appendix B
Appendix C
Acronyms
O&A Report Form
List of Attachments
A. DESCRIPTION OF SERVICES
1.0 BACKGROUND. The South Bay International Water Treatment Plant (SBIWTP) was initially designed as a twenty-five million gallon per day (25 MGD) wastewater treatment plant located at 2995 Clearwater Way, in San Diego, California, on the International Boundary. Construction of the plant’s advanced primary treatment was completed in September 1997, and construction of the secondary treatment was completed in May 2011. From 2011 to 2025, the plant treated an average of 25MGD/day of wastewater originating in Tijuana, Baja California, Mexico. SBIWTP is operated under the authority and at the direction of the United States Section, International Boundary and Water Commission (USIBWC). An average of 25 MGD of effluent is discharged through the South Bay Ocean Outfall (SBOO) which is subject to the requirements of the National Pollutant Discharge Elimination System (NPDES) Permit, Permit Number CA0108928, Order Number R9-2023-0009, and Order Number R9-2026-0005, As Amended. The NPDES Permit is issued by the California Regional Water Quality Control Board (CRWQCB). It is anticipated that a new NPDES Permit will be issued during the contract period that may have additional requirements outside the current scope. When needed, a modification to this Contract will be prepared to address additional permitting requirements.
Information describing the SBIWTP, SBOO, and other related infrastructure, are referred to as The Facility.
The Facility consists of:
Five diversion structure canyon collectors located at:
Stewart’s Drain
Canyon del Sol
Silva’s Drain
Smuggler’s Gulch
Goat Canyon
Two pump stations
Hollister Street Pump Station
Goat Canyon Pump Station
Two junction boxes
Junction Box 1
The beginning of the document. Download the full file to read on.
Other documents in this bid
- OM SBIWTP Services
- Attachment 2: FY26 SBIWTP O&M Quality Assurance Surveillance Plan
- Attachment 2: FY26 SBIWTP O&M Quality Assurance Surveillance Plan
- Attachment 4: Order No. as amended
- Attachment 4.a. GiantKelpVariance
- Attachment 5: List-of-Permits
- Attachment 5: List-of-Permits
- Attachment 7: FY26 IBWC Condition Assessment Report
- Attachment 9: SBIWTP Capital Project List as of
- Attachment 12 2025 NPDES ANNUAL BIOSOLIDS REPORT
- Attachment 15: NIST SP.800-171r3
- Attachment 18: NIST FIPS.199