ILSM 612A4-27-020 Replace Flooring in McCellan
Safety Permit Request #595
Interim Life Safety Measures (ILSM)
NorCal
Initiated by Lye Saechao
Submitted 6/25/2026
Engineering Review: Approved by vhamacstettw 6/30/2026
1: Project Infomration
1.1: Project Number
1.2: Project Name *
612A4-27-020
Replace Flooring in McCellan
1.3: Project COR/Lead Name (last, first) *
Lye Saechao
1.4: Location of activity
McClellan
1.5: Building
x 2
1.6: Room(s)
209 and 949 rooms with carpet
1.7: Project Description *
Replace existing carpet and wall base with new.
1.8: Does this project include multiple tasks/phases? *
x Yes
1.8.1: If yes, list phases with estimated start/stop dates below.
Phase 1: 209 1st level, 20 days, 10/21/26-11/10/26.
Phase 2: 209 2nd level, 20 days, 11/11/26-12/1/26.
Phase 3: 949 1st level, 20 days, 12/2/26-12/22/26.
Phase 4: 949 2nd level, 20 days, 12/23/26-1/12/27.
Phase 5: 949 3rd level, 20 days, 1/13/27-2/2/27.
1.9: Start Date *
1.10: End Date *
10/01/2026
02/02/2027
2: Action Item 1: Exits
2.1: Ensure free and unobstructed exits.
Ensure that, at a minimum, the number of exits required by NFPA 101 are accessible (Note per paragraph 7.4 not less than two exits). Post signage identifying the location of alternate exits to everyone affected. Ensure that staff gets additional training when alternative exits are designated. Buildings or areas under construction must maintain escape routes for construction workers at all times and the means of exiting construction areas are inspected daily. *
x Yes
2.2: Impacted area/floors
(Note: multiple floors may be impacted, particularly if stairwells are involved)
Interim Life Safety Measures (ILSM)
Continued on the next page.
Impacted area/floors
(Note: multiple floors may be impacted, particularly if stairwells are involved) continued
All levels of 209 and 949
2.3: Minimum number of exits required on each impacted floor?
2.4: Number of exits impacted on each floor by this project?
2.5: Number of exits impacted on each floor by other construction projects?
2.6: Total number of accessible exits remaining on each floor?
2.7: Exits requiring signage:
2.8: Information on sign(s):
"INTERIM LIFE SAFETY MEASURE IN PROGRESS USE ALTERNATE EXIT"
2.9: Exit signs to be removed:
Stairwell and corridor signs will be covered in phases, not simultaneously 2.10: Exit signs to be added:
2.11: Attach maps if alternative escape routes will be required.
3: Action Item 2: Emergency Services
3.1: Ensure free an unobstructed access to emergency services.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Statement of Work ATTACHMENT Specifications
- Made in the USA Supply Chain PDF v7 Digital
- PCRA Replace Flooring in McCellan
- MILLWORK WALL FINISHING SYSTEMS
- WALL BASE
- RST RESILIENT STAIR TREADS
- Tarkett Wall Base Made in USA
- VHA ICRA PROJECT
- Wage Determination dtd 9 3 2026
- Site Visit Flyer
- Price Breakdown Worksheet
- Statement of Work ATTACHMENT Reference Drawings