Home / FY27 NRM Replace Flooring in McClellan VA Northern… / Document

PCRA Replace Flooring in McCellan

Updated

A PDF document (68 KB) attached to FY27 NRM Replace Flooring in McClellan VA Northern California Health Care System McClellan CA Project 612A4 27 020, from the Department of Veterans Affairs. Due Nov 17, 2026, 3:00 PM (UTC-8).

File name: 11. PCRA 612A4-27-020 Replace Flooring in McCellan.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

PCRA 612A4-27-020 Replace Flooring in McCellan
Safety Permit Request #581
Pre-Construction Risk Assessment (PCRA)
NorCal

Initiated by Lye Saechao
Submitted 6/23/2026

Notify Safety Group: Approved by vhamacstettw 6/30/2026

1: Project Information
1.1: Project Number

1.2: Project Name *

612A4-27-020

Replace Flooring in McCellan

1.3: Project COR/Lead Name (Last, First) *

Lye Saechao
1.4: Campus *

x McClellan
1.5: Building/s

209 and 949
1.6: Room/s

carpet flooring throughout all rooms
1.7: Project Description *

Replace existing carpet and wall base with new.
1.8: Phases *

x Yes
1.8.1: If yes, list phases with estimated start/stop dates below.

Phase 1: 209 1st level, 20 days.
Phase 2: 209 2nd level, 20 days.
Phase 3: 949 1st level, 20 days.
Phase 4: 949 2nd level, 20 days.
Phase 5: 949 3rd level, 20 days.
1.9: Start Date *

1.10: End Date *

10/01/2026

01/29/2027

2:

Pre-Construction Risk Assessment (PCRA)

Continued on the next page.

Infection Control

2.1: Dust will be generated (i.e. from drilling, cutting, sawing, etc.) in or adjacent to patent care areas. *

x No
2.1.1: If yes, complete ICRA and implement measures identified. 2.2: Work is being performed in a patient care area. *

x No
2.2.1: If yes, complete ICRA and implement measures identified. 2.3: Construction area is greater than 110 ft2 and/or >3 ceiling tiles will be removed. *

x Yes
2.3.1: If yes, complete ICRA and implement measures identified.

3: Fire/Life Safety
3.1: General construction, renovation, or significant repairs will take place in an occupied building. *

x Yes
3.1.1: If yes, complete ILSM action items 6, 7, and 9.
3.2: Egress pathways or exits will be blocked or partially obstructed by construction activities, partitions, or Infection Control measures. *

x Yes
3.2.1: If yes, complete ILSM action items 1, 8, 10, and 11. 3.3: Smoke or fire walls will be breached where a temporary seal cannot maintain barrier integrity. Consult Fire and Smoke Barrier Diagrams. *

x No

Pre-Construction Risk Assessment (PCRA)

Continued on the next page.

3.3.1: If yes, complete ILSM action items 2, 3, 7, 8, and 9. 3.4: Building emergency responder or fire equipment, fire hydrant, standpipe or connection blocked or obstructed, or removed from service. Note: This includes both interior and exterior access. *

x No
3.4.1: If yes, notify appropriate emergency services (Local Fire Department). Take actions to provide alternate access points, if possible. (Must be approved by Safety Department)

The beginning of the document. Download the full file to read on.