Home / FY27 NRM Replace Flooring in McClellan VA Northern… / Document

Statement of Work ATTACHMENT Specifications

Updated

A PDF document (2.8 MB) attached to FY27 NRM Replace Flooring in McClellan VA Northern California Health Care System McClellan CA Project 612A4 27 020, from the Department of Veterans Affairs. Due Nov 17, 2026, 3:00 PM (UTC-8).

File name: 1. SOW ATTACHMENT_Specifications_.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

612A4-27-020

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

Section 00 01 10

SECTION NO

DIVISION AND SECTION TITLES

DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 10

00 01 15

List of Drawings

09-26
09-26

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00

01 33 23

01 35 26

01 42 19

01 74 19

01 81 13

General Requirements
Shop Drawings, Product Data, and Samples
Safety Requirements
Reference Standards
Construction Waste Management
Sustainable Construction Requirements

09-26
11-23
05-24
11-20
04-22
10-17

DIVISION 02 – EXISTING CONDITIONS

02 41 00

02 82 11

02 82 13.19

Demolition
Traditional Asbestos Abatement
Asbestos Floor tile and Mastic Abatement

09-26
09-26
09-26

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 84 00

07 92 00

Firestopping
Joint Sealants

09-26
06-26

DIVISION 09 – FINISHES

09 05 16

09 06 00

09 65 13

09 65 19

09 68 00

Subsurface Preparation for Floor Finishes
Schedule for Finishes
Resilient Base and Accessories
Resilient Tile Flooring
Carpeting

00 01 10-1

06-26
06-26
09-26
06-26
06-26

612A4-27-020
09-14-20

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.
Drawing No.

BUILDING

Title

VA100

-

COVER SHEET

VA101

ARCHITECTURAL PLAN – BASEMENT (N.I.C.)

VA102A

ARCHITECTURAL PLAN – EXISTING LEVEL 1 FLOORING

VA102B

ARCHITECTURAL PLAN – NEW LEVEL 1 FLOORING

VA103A

ARCHITECTURAL PLAN – EXISTING LEVEL 2 FLOORING

VA103B

ARCHITECTURAL PLAN – NEW LEVEL 2 FLOORING

VA104A

ARCHITECTURAL PLAN – EXISTING BASEMENT FLOORING

VA104B

ARCHITECTURAL PLAN – NEW BASEMENT FLOORING

VA105A

ARCHITECTURAL PLAN – EXISTING LEVEL 1 FLOORING

VA105B

ARCHITECTURAL PLAN – NEW LEVEL 1 FLOORING

VA106A

ARCHITECTURAL PLAN – EXISTING LEVEL 2 FLOORING

VA106B

ARCHITECTURAL PLAN – NEW LEVEL 2 FLOORING

VA107A

ARCHITECTURAL PLAN – EXISTING LEVEL 1 FLOORING

VA107B

ARCHITECTURAL PLAN – NEW LEVEL 1 FLOORING

VA108A

ARCHITECTURAL PLAN – EXISTING LEVEL 2 FLOORING

VA108B

ARCHITECTURAL PLAN – NEW LEVEL 2 FLOORING

VA109A

ARCHITECTURAL PLAN – EXISTING LEVEL 3 FLOORING

VA109B

ARCHITECTURAL PLAN – NEW LEVEL 3 FLOORING

- - - END - - -

00 01 15 - 1

612A4-27-020

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1

SAFETY REQUIREMENTS

A. Refer

to section 01 35 26, SAFETY REQUIREMENTS for safety

and infection control requirements.
1.2

GENERAL INTENTION

A. Contractor

must remove existing flooring, stair treads,

wall bases, and their related accessories and replace with new. Locations of work are per the provided project
drawings for McClellan VA buildings 98, 209 and 949.

The beginning of the document. Download the full file to read on.

Other documents in this bid