Attachment JA48
Utilities Privatization System Performance Metrics
SP060026R0813
UTILITIES PRIVATIZATION
SYSTEM PERFORMANCE METRICS
The following metrics are provided as indicators of increased or decreased utility system performance as a result of privatization:
1. Metric: Number of emergency service requests received each month of each year.
Applicable Systems: Electric, Gas, Water, and Wastewater. Discussion: Besides the condition of the system, there are many different factors that affect the number of emergency service requests that will be received….weather, size of system, complexity of system, configuration of system, season of the year, definition of emergency service request, amount of ongoing construction, etc., etc. Because of this, the actual number of emergency service requests received is not what is important. What is important is the trend in the numbers.
What to Do: Record the number of emergency service requests received each month (see example table below). Because the SO is required to maintain a record of all service calls for a minimum of two years, this information should be readily available through the COR. Year
2008
2009
2010
2011
2012
2013
2014
Average
J
Number of Emergency Service Requests Received
F
M
A
M
J
J
A
S
O
107 92
66 75
75 63 73
102 86
62 71
72 59 69
62 67
68 55 65
54 60
62 50 58
52 57
59 48 57
50 55
58 47 58
49 56
56 50 56
56 63
64 53 62
N
D
Total
What to Expect: What you should see is a significant decline in the number of emergency service requests over the first 5 to 7 years of the contract. After that, there will be a leveling off at some number significantly below that of the original year. If this occurs, it will be a good indicator that Utilities Privatization is having its intended effect of improving system performance.
Attachment JA48
Utilities Privatization System Performance Metrics
SP060026R0813
2. Metric: Number of unplanned outages (regardless of duration) that occur each month of each year. Note: This number should not include outages that are related to construction of new facilities regardless of whether they are planned or unplanned (we don’t want a high volume of construction efforts to influence this metric). Applicable Systems: Electric, Gas, Water, and Wastewater. Discussion: Besides the condition of the system, there are many different factors that affect the number of unplanned outages….weather, size of system, complexity of system, configuration of system, season of the year, etc., etc. Because of this, the actual number of
The beginning of the document. Download the full file to read on.
Other documents in this bid
- JA38 Federal Equivalents
- JA39 Past Performance Information
- JA40 FP-EPA and FP-PPR Example
- JA44 Quality Assurance Surveillance Plan
- JA47 NDA Offeror and Nongovernment Advisor AI
- JA47 NDA Offeror and Nongovernment Advisor CHG
- JA47 NDA Offeror and Nongovernment Advisor LR3
- JA47 NDA Offeror and Nongovernment Advisor TEC
- JR1 Army Sample Bill of Sale
- JR2 Tech Eval Categories
- JR3 Sample Connection Charge Agreement
- USAG-HI Island of Oahu